Value stream mapping,engineered for speed.
Replace fragmented Visio drawings, desktop statistical suites, and manual spreadsheets. Map ISO 22468 value streams, balance Yamazumi & Pareto, run 1,000 Monte-Carlo simulations, size Kanban loops, and execute FMEA, SMED, 5S, and A3 in one workspace.
Generate with AI (uses credits)
Every paid Lean tool.Unified in one workspace.
Mapping, calculations, simulation and improvement tools that usually live in separate applications, together in your browser.
Reactive Vector VSM & Sawtooth Ladder
Automatic supplier-to-customer mapping with electronic ERP arrows, Supermarkets, Push/Pull/FIFO flows, Kaizen starbursts, and real-time Takt, PCE, RTY, and WIP cash.
Bottleneck Balancing & 80/20 Loss Pareto
Visualize station VA vs. downtime and quality losses against Customer Takt, and rank operational losses with an automatic 80/20 Pareto curve.
Stochastic Simulation & Kanban Sizing
Run 1,000 Monte-Carlo variability trials in milliseconds, measure P90 delivery risk, test live What-If sliders, and calculate exact Kanban cards and Heijunka pitch.
SIPOC, Ishikawa, FMEA, SMED, 5S & A3
Execute end-to-end root-cause analysis, SMED Internal-to-External conversions, 5S Gemba audits, A3 one-pagers, and multi-sheet Excel (.xlsx) import/export.
Working capital unlocked, calculated in seconds.
Model the financial and carbon impact of converting Push queues into Kanban Pull supermarkets and SMED changeovers.
1,080 exact blueprints.Across 15 sectors & 90 sub-sectors.
Launch immediately and 100% free with calibrated ISO 22468 Value Stream maps across manufacturing, pharma, logistics, healthcare, finance, software, energy, and construction.
Automotive Electromechanical Assembly
Stamping press, robotic welding, e-coat surface treatment, final assembly cell, and end-of-line test bench.
Aerospace 5-Axis CNC & NDT Inspection
Titanium billet sawing, stress-relief mill, 5-axis CNC bottleneck, heat treat, FPI penetrant NDT, and CMM certification.
Sheet Metal Laser, Bending & Powder Coat
Fiber laser nesting cut, deburring, CNC press-brake bending + MIG welding bottleneck, powder coating cure, and hardware assembly.
PCB SMT Pick-and-Place & Box Build
Solder paste stencil printing, high-speed SMD pick-and-place + reflow bottleneck, 3D AOI inspection, selective wave, and ICT box-build.
Sterile Vial Fill-Finish & QC Release
Cleanroom Grade-A compounding, aseptic vial filling & lyophilization bottleneck, optical QC, FMD serialization, and QP release.
18,000 bph PET Bottling Line
High-speed beverage line from preform blow molding through aseptic filling bottleneck, labeling, shrink-wrapping, and palletizing.
UHT Aseptic Dairy Processing & Filling
Raw milk standardization, homogenization, UHT thermal sterilization + CIP cycle bottleneck, aseptic brick filling, and cold-room palletizing.
250T Plastic Injection & Assembly
Resin drying, 250T molding with high mold changeover (SMED target), vision QC, insert assembly, and packing.
Specialty Coatings Batch Mixing & Fill
Powder dispersion, high-shear reactor mixing, lab shade/viscosity QC bottleneck, fine filtration, and automated drum filling.
Apparel Cut-Make-Trim (CMT) Garment Line
Fabric spreading & automatic cutting, progressive bundle sewing bottleneck, washing/pressing, and AQL garment packing.
Modular Cabinetry & Millwork Line
CNC panel sizing, PUR edge banding, UV lacquer curing bottleneck, dowel boring, and flat-pack retail crating.
E-Commerce Fulfillment Hub
Dock receiving, WMS putaway, wave picking bottleneck, packing & weigh-check, and express carrier dispatch.
Design from scratch & 1,080 blueprints free.Plus 5 free AI credits when you sign up.
Build ISO 22468 Value Streams manually or launch from 1,080 exact industry blueprints with zero paywall. Sign in with Google or Email to receive 5 free AI credits when you sign up.
- Blank From-Scratch VSM Canvas & Drag-and-Drop Shapes (100% Free)
- 1,080 exact industry templates — 15 sectors, 90 sub-sectors (Free)
- Yamazumi Balancing, 80/20 Pareto, 1,000-Run Monte-Carlo & Kanban (Free)
- Full OpEx Suite: SIPOC, 6M Fishbone, FMEA, SMED, 5S & A3 (Free)
- 4-Sheet Excel (.xlsx), Vector SVG, HD PNG & A3 PDF Exports (Free)
- AI Synthesis: 5 free AI credits when you sign up (1 credit = 1 generation)