Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
150kW Aircraft Auxiliary Power Unit Assembly
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
45.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.5 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.76%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Fuel Control Hydromech Fit
13 < 20/day
Limit: downtime
Fuel Control Hydromech Fit: capacity 13/day vs demand 20/day. Main limit: downtime. Raw C/T 48.6 min, effective C/T 1.0 h.
Quality (RTY)
85.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€5,424,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
174.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Tier-2 castings suppl…
Centrifugal Impellers &…
Weekly · LT 21d
PRODUCTION CONTROL / ERP
Manufacturing ERP
Engine Serial Synchronization
CUSTOMER
OEM Final Assembly Ta…
20 units/d
Takt: 45.0 min
EDI / Weekly Stand
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
50
2.50 d
Drag to reorder step 1
FOUNDRY
1. Impeller 5-Axis …
×2
Push Flow
C/T
32.4 min
C/O
40 min
Availability
92%
Quality FPY
96.4%
Batch / EPEI
40 / 3d
OEE
86.7%
i
Insert a step here
+
I
44
2.20 d
Drag to reorder step 2
GRIND CELL
2. Combustor & Bear…
×2
Push Flow
C/T
37.8 min
C/O
50 min
Availability
89%
Quality FPY
97.1%
Batch / EPEI
20 / 2d
OEE
81.6%
i
Insert a step here
+
I
52
2.60 d
AUTOMATION
Multi-Axi…
Drag to reorder step 3
THERMAL EDM
3. Fuel Control Hyd…
×2
BOTTLENECK
C/T
48.6 min
C/O
65 min
Availability
83%
Quality FPY
94.2%
Batch / EPEI
20 / 3d
OEE
72.5%
i
Insert a step here
+
I
28
1.40 d
Drag to reorder step 4
MODULE STACK
4. Starter-Generato…
×2
FIFO Lane
C/T
34.2 min
C/O
30 min
Availability
92%
Quality FPY
98.0%
Batch / EPEI
10 / 1d
OEE
84.1%
i
FIFO
Insert a step here
+
I
22
1.10 d
Drag to reorder step 5
TEST CELL
5. 5-Cycle Hot-Star…
×3
FIFO Lane
C/T
29.3 min
C/O
45 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
10 / 1d
OEE
83.6%
i
Insert a step at the end
+
I
30
1.50 d
Finished Goods
OUT
2.50 d
VA 32.4 min
2.20 d
VA 37.8 min
2.60 d
VA 48.6 min
1.40 d
VA 34.2 min
1.10 d
VA 29.3 min
1.50 d
Total Lead Time
11.5 d
VA Time
3.0 h
PCE
1.76%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step