Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Titanium Compressor Blisk 5-Axis Flank Mill
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.9 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
12.9 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
7.5 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.57%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
5-Axis Flank Airfoil Finish
8 < 12/day
Limit: downtime
5-Axis Flank Airfoil Finish: capacity 8/day vs demand 12/day. Main limit: downtime. Raw C/T 2.0 h, effective C/T 2.6 h.
Quality (RTY)
89.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€634,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
41.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Specialty titanium-al…
Ti-6242 Forged Pancakes
Weekly · LT 14d
PRODUCTION CONTROL / ERP
Aerospace ERP
AS9100 Traveler Push
CUSTOMER
Turbofan Fan Module L…
12 parts/d
Takt: 1.9 h
EDI / 3x / week
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
26
2.17 d
Drag to reorder step 1
SAW PREP
1. Ultrasonic Bille…
×1
Push Flow
C/T
1.1 h
C/O
25 min
Availability
96%
Quality FPY
99.4%
Batch / EPEI
24 / 2d
OEE
94.5%
i
Insert a step here
+
I
29
2.42 d
Drag to reorder step 2
CNC BAY
2. Airfoil Rough Sl…
×2
Push Flow
C/T
1.5 h
C/O
35 min
Availability
92%
Quality FPY
98.5%
Batch / EPEI
18 / 2d
OEE
89.1%
i
Insert a step here
+
I
34
2.83 d
SMED
Zero-Poin…
Drag to reorder step 3
PRECISION CELL
3. 5-Axis Flank Air…
×2
BOTTLENECK
C/T
2.0 h
C/O
85 min
Availability
83%
Quality FPY
95.0%
Batch / EPEI
12 / 3d
OEE
73.9%
i
Insert a step here
+
I
26
2.17 d
Drag to reorder step 4
SPECIAL PROCESS
4. Micro-Polish & S…
×1
Push Flow
C/T
1.5 h
C/O
30 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
18 / 2d
OEE
90.0%
i
Insert a step here
+
I
14
1.17 d
Drag to reorder step 5
AS9100 QUALITY
5. Blue-Light 3D Bl…
×2
FIFO Lane
C/T
1.3 h
C/O
15 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
6 / 1d
OEE
90.7%
i
Insert a step at the end
+
I
22
1.83 d
Finished Goods
OUT
2.17 d
VA 1.1 h
2.42 d
VA 1.5 h
2.83 d
VA 2.0 h
2.17 d
VA 1.5 h
1.17 d
VA 1.3 h
1.83 d
Total Lead Time
12.9 d
VA Time
7.5 h
PCE
2.57%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen