Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.9 h
Lead Time (LT)
12.9 d
Value-Added
7.5 h
Efficiency (PCE)
2.57%
Bottleneck5-Axis Flank Airfoil Finish
8 < 12/day
Limit: downtime
Quality (RTY)
89.1%
WIP Capital
€634,200
Carbon CO₂
41.1 t CO₂e/year