Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Bipolar Full-Spectrum Mood Cabin Lighting
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.01 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
8.5 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.10%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
DALI / ARINC Address Flash
294 < 420/day
Limit: downtime
DALI / ARINC Address Flash: capacity 294/day vs demand 420/day. Main limit: downtime. Raw C/T 2.3 min, effective C/T 2.9 min.
Quality (RTY)
87.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,096,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
369.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Automotive LED suppli…
Al-Core PCBs & Poly Lens
Weekly · LT 18d
PRODUCTION CONTROL / ERP
Business ERP
Serial Lot Qualification Push
CUSTOMER
Cabin Completion Shop
420 units/d
Takt: 2.1 min
EDI / 2x / week
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
630
1.50 d
Drag to reorder step 1
AVIONICS SMT
1. Metal-Core PCB S…
×2
Push Flow
C/T
93 s
C/O
35 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
336 / 2d
OEE
87.8%
i
Insert a step here
+
I
672
1.60 d
Drag to reorder step 2
CLASS-3 BENCH
2. Silicone Extrude…
×4
Push Flow
C/T
105 s
C/O
15 min
Availability
92%
Quality FPY
96.8%
Batch / EPEI
210 / 1d
OEE
86.1%
i
Insert a step here
+
I
1,008
2.40 d
SMED
Parallel …
Drag to reorder step 3
ENV CHAMBER
3. DALI / ARINC Add…
×2
BOTTLENECK
C/T
2.3 min
C/O
45 min
Availability
85%
Quality FPY
93.8%
Batch / EPEI
420 / 2d
OEE
75.7%
i
Insert a step here
+
I
462
1.10 d
Drag to reorder step 4
ENCLOSURE
4. Flammability FAR…
×2
FIFO Lane
C/T
90 s
C/O
20 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
168 / 1d
OEE
88.4%
i
FIFO
Insert a step here
+
I
378
0.90 d
Drag to reorder step 5
FLIGHT CERT
5. 24h Luminance Bu…
×2
Continuous Flow
C/T
82 s
C/O
12 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
105 / 1d
OEE
90.1%
i
Insert a step at the end
+
I
630
1.50 d
Finished Goods
OUT
1.50 d
VA 93 s
1.60 d
VA 105 s
2.40 d
VA 2.3 min
1.10 d
VA 90 s
0.90 d
VA 82 s
1.50 d
Total Lead Time
9.01 d
VA Time
8.5 min
PCE
0.10%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step