Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
SiC-SiC Ceramic Matrix Exhaust Mixer
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.3 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.55%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
1600°C Inert Furnace Cure
17 < 25/day
Limit: downtime
1600°C Inert Furnace Cure: capacity 17/day vs demand 25/day. Main limit: downtime. Raw C/T 19.4 min, effective C/T 24.4 min.
Quality (RTY)
86.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,473,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
89.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Silicon carbide fiber…
SiC Woven Fiber Preforms
Weekly -18°C · LT 12d
PRODUCTION CONTROL / ERP
Aerospace ERP
Autoclave Batch Load
CUSTOMER
Next-Gen Turbofan Line
25 parts/d
Takt: 18.0 min
EDI / 2x / week
MRP / Weekly -18°C
★ PACEMAKER
IN
Insert a step at the start
+
I
40
1.60 d
Drag to reorder step 1
CLEANROOM PLY
1. 3D Ceramic Braid…
×2
FIFO Lane
C/T
11.7 min
C/O
20 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
25 / 2d
OEE
89.9%
i
FIFO
Insert a step here
+
I
50
2.00 d
Drag to reorder step 2
LAYUP ROOM
2. Slurry PIP & CVI…
×2
Push Flow
C/T
15.1 min
C/O
45 min
Availability
90%
Quality FPY
97.2%
Batch / EPEI
20 / 2d
OEE
76.5%
i
Insert a step here
+
I
65
2.60 d
SMED
Quick Vac…
Drag to reorder step 3
CURE DECK
3. 1600°C Inert Fur…
×2
BOTTLENECK
C/T
19.4 min
C/O
60 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
38 / 3d
OEE
72.6%
i
Insert a step here
+
I
33
1.32 d
Drag to reorder step 4
TRIM BAY
4. Diamond Ultrason…
×2
FIFO Lane
C/T
13.3 min
C/O
25 min
Availability
93%
Quality FPY
97.8%
Batch / EPEI
13 / 1d
OEE
81.2%
i
FIFO
Insert a step here
+
I
28
1.12 d
Drag to reorder step 5
NDT LAB
5. Thermography Voi…
×2
FIFO Lane
C/T
12.2 min
C/O
15 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
13 / 1d
OEE
86.1%
i
Insert a step at the end
+
I
38
1.52 d
Finished Goods
OUT
1.60 d
VA 11.7 min
2.00 d
VA 15.1 min
2.60 d
VA 19.4 min
1.32 d
VA 13.3 min
1.12 d
VA 12.2 min
1.52 d
Total Lead Time
10.3 d
VA Time
1.2 h
PCE
1.55%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step