Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Laser-Drilled Effusion Cooling Combustor
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.1 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.6 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.3 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.50%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Electron-Beam Flange Weld
9 < 14/day
Limit: downtime
Electron-Beam Flange Weld: capacity 9/day vs demand 14/day. Main limit: downtime. Raw C/T 1.2 h, effective C/T 1.5 h.
Quality (RTY)
85.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,243,600
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
121.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Cobalt-nickel superal…
Formed Superalloy Rings
Weekly · LT 21d
PRODUCTION CONTROL / ERP
Production ERP
Engine Serial Synchronization
CUSTOMER
Turbofan Hot Core Line
14 units/d
Takt: 1.1 h
EDI / Weekly Stand
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
35
2.50 d
Drag to reorder step 1
FOUNDRY
1. Hydro-Spin Annul…
×2
Push Flow
C/T
46.3 min
C/O
40 min
Availability
92%
Quality FPY
96.4%
Batch / EPEI
28 / 3d
OEE
86.7%
i
Insert a step here
+
I
31
2.21 d
Drag to reorder step 2
GRIND CELL
2. 5000-Hole Laser …
×2
Push Flow
C/T
54.0 min
C/O
50 min
Availability
89%
Quality FPY
97.1%
Batch / EPEI
14 / 2d
OEE
81.6%
i
Insert a step here
+
I
36
2.57 d
AUTOMATION
Multi-Axi…
Drag to reorder step 3
THERMAL EDM
3. Electron-Beam Fl…
×2
BOTTLENECK
C/T
1.2 h
C/O
65 min
Availability
83%
Quality FPY
94.2%
Batch / EPEI
14 / 3d
OEE
72.5%
i
Insert a step here
+
I
20
1.43 d
Drag to reorder step 4
MODULE STACK
4. Yttria TBC Therm…
×2
FIFO Lane
C/T
48.9 min
C/O
30 min
Availability
92%
Quality FPY
98.0%
Batch / EPEI
7 / 1d
OEE
84.1%
i
FIFO
Insert a step here
+
I
15
1.07 d
Drag to reorder step 5
TEST CELL
5. Flow-Check Press…
×3
FIFO Lane
C/T
41.8 min
C/O
45 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
7 / 1d
OEE
83.6%
i
Insert a step at the end
+
I
21
1.50 d
Finished Goods
OUT
2.50 d
VA 46.3 min
2.21 d
VA 54.0 min
2.57 d
VA 1.2 h
1.43 d
VA 48.9 min
1.07 d
VA 41.8 min
1.50 d
Total Lead Time
11.6 d
VA Time
4.3 h
PCE
2.50%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step