Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Liquid Hydrogen Cryogenic Rocket Valve
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
28.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.6 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.19%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Cleanroom Oxygen Cleaning
10 < 16/day
Limit: changeovers
Cleanroom Oxygen Cleaning: capacity 10/day vs demand 16/day. Main limit: changeovers. Raw C/T 30.4 min, effective C/T 38.9 min.
Quality (RTY)
85.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,411,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
139.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Special alloy bar sup…
Nickel-Alloy & PCTFE Cr…
Weekly · LT 21d
PRODUCTION CONTROL / ERP
Space MES
Engine Serial Synchronization
CUSTOMER
Launch Vehicle Propul…
16 units/d
Takt: 28.1 min
EDI / Weekly Stand
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
40
2.50 d
Drag to reorder step 1
FOUNDRY
1. CNC Body & Poppe…
×2
Push Flow
C/T
20.3 min
C/O
40 min
Availability
92%
Quality FPY
96.4%
Batch / EPEI
32 / 3d
OEE
84.7%
i
Insert a step here
+
I
35
2.19 d
Drag to reorder step 2
GRIND CELL
2. PCTFE Cryo Seat …
×2
Push Flow
C/T
23.6 min
C/O
50 min
Availability
89%
Quality FPY
97.1%
Batch / EPEI
16 / 2d
OEE
76.8%
i
Insert a step here
+
I
42
2.63 d
AUTOMATION
Multi-Axi…
Drag to reorder step 3
THERMAL EDM
3. Cleanroom Oxygen…
×2
BOTTLENECK
C/T
30.4 min
C/O
65 min
Availability
83%
Quality FPY
94.2%
Batch / EPEI
16 / 3d
OEE
66.9%
i
Insert a step here
+
I
22
1.38 d
Drag to reorder step 4
MODULE STACK
4. Liquid Helium 20…
×2
FIFO Lane
C/T
21.4 min
C/O
30 min
Availability
92%
Quality FPY
98.0%
Batch / EPEI
8 / 1d
OEE
78.1%
i
FIFO
Insert a step here
+
I
18
1.13 d
Drag to reorder step 5
TEST CELL
5. 50-Cycle Cryo Ac…
×3
FIFO Lane
C/T
18.3 min
C/O
45 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
8 / 1d
OEE
74.3%
i
Insert a step at the end
+
I
24
1.50 d
Finished Goods
OUT
2.50 d
VA 20.3 min
2.19 d
VA 23.6 min
2.63 d
VA 30.4 min
1.38 d
VA 21.4 min
1.13 d
VA 18.3 min
1.50 d
Total Lead Time
11.6 d
VA Time
1.9 h
PCE
2.19%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step