Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
1.1 h
Lead Time (LT)
11.6 d
Value-Added
4.3 h
Efficiency (PCE)
2.50%
BottleneckVacuum Chamber TIG Weld
9 < 14/day
Limit: downtime
Quality (RTY)
85.4%
WIP Capital
€1,327,200
Carbon CO₂
121.8 t CO₂e/year