Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
15-5PH Stainless Flap Track Carriage
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
25.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
12.7 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.87%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
H1025 Precipitation Harden
24 < 36/day
Limit: downtime
H1025 Precipitation Harden: capacity 24/day vs demand 36/day. Main limit: downtime. Raw C/T 27.0 min, effective C/T 34.2 min.
Quality (RTY)
89.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€520,950
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
123.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Stainless forging sup…
15-5PH Stainless Forgin…
Weekly · LT 14d
PRODUCTION CONTROL / ERP
Production ERP
AS9100 Traveler Push
CUSTOMER
Wing Trailing Edge Li…
36 parts/d
Takt: 25.0 min
EDI / 3x / week
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
79
2.19 d
Drag to reorder step 1
SAW PREP
1. CNC Datum Slab M…
×1
Push Flow
C/T
15.0 min
C/O
25 min
Availability
96%
Quality FPY
99.4%
Batch / EPEI
72 / 2d
OEE
94.1%
i
Insert a step here
+
I
86
2.39 d
Drag to reorder step 2
CNC BAY
2. Bore & Gear Rack…
×2
Push Flow
C/T
19.5 min
C/O
35 min
Availability
92%
Quality FPY
98.5%
Batch / EPEI
54 / 2d
OEE
88.3%
i
Insert a step here
+
I
101
2.81 d
SMED
Zero-Poin…
Drag to reorder step 3
PRECISION CELL
3. H1025 Precipitat…
×2
BOTTLENECK
C/T
27.0 min
C/O
85 min
Availability
83%
Quality FPY
95.0%
Batch / EPEI
36 / 3d
OEE
71.4%
i
Insert a step here
+
I
79
2.19 d
Drag to reorder step 4
SPECIAL PROCESS
4. Cadmium/Zn-Ni Co…
×1
Push Flow
C/T
20.5 min
C/O
30 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
54 / 2d
OEE
89.3%
i
Insert a step here
+
I
43
1.19 d
Drag to reorder step 5
AS9100 QUALITY
5. Load Bearing Fit…
×2
FIFO Lane
C/T
17.5 min
C/O
15 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
18 / 1d
OEE
89.6%
i
Insert a step at the end
+
I
65
1.81 d
Finished Goods
OUT
2.19 d
VA 15.0 min
2.39 d
VA 19.5 min
2.81 d
VA 27.0 min
2.19 d
VA 20.5 min
1.19 d
VA 17.5 min
1.81 d
Total Lead Time
12.7 d
VA Time
1.7 h
PCE
0.87%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen