One-Piece CFRP Aircraft Fuselage Section
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.6 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.7 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
22.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
9.28%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Mega-Autoclave Cure Cycle
3 < 4/day
Limit: downtime
Mega-Autoclave Cure Cycle: capacity 3/day vs demand 4/day. Main limit: downtime. Raw C/T 6.1 h, effective C/T 7.6 h.
Quality (RTY)
86.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,092,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
14.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Carbon prepreg suppli…
Intermediate-Modulus Ca…
Weekly -18°C · LT 12d
PRODUCTION CONTROL / ERP
MES
Autoclave Batch Load
CUSTOMER
Airframe Section Join…
4 units/d
Takt: 5.6 h
EDI / 2x / week
MRP / Weekly -18°C
★ PACEMAKER
IN
Insert a step at the start
+
I
6
1.50 d
Drag to reorder step 1
CLEANROOM PLY
1. Rotating Mandrel…
×2
FIFO Lane
C/T
3.7 h
C/O
20 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
4 / 2d
OEE
92.7%
i
FIFO
Insert a step here
+
I
8
2.00 d
Drag to reorder step 2
LAYUP ROOM
2. Stringer Hat Co-…
×2
Push Flow
C/T
4.7 h
C/O
45 min
Availability
90%
Quality FPY
97.2%
Batch / EPEI
3 / 2d
OEE
83.6%
i
Insert a step here
+
I
10
2.50 d
SMED
Quick Vac…
Drag to reorder step 3
CURE DECK
3. Mega-Autoclave C…
×2
BOTTLENECK
C/T
6.1 h
C/O
60 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
6 / 3d
OEE
77.3%
i
Insert a step here
+
I
5
1.25 d
Drag to reorder step 4
TRIM BAY
4. Gantry Ultrasoni…
×2
FIFO Lane
C/T
4.2 h
C/O
25 min
Availability
93%
Quality FPY
97.8%
Batch / EPEI
2 / 1d
OEE
87.6%
i
FIFO
Insert a step here
+
I
4
1.00 d
Drag to reorder step 5
NDT LAB
5. Full-Barrel Phas…
×2
FIFO Lane
C/T
3.8 h
C/O
15 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
2 / 1d
OEE
89.9%
i
Insert a step at the end
+
I
6
1.50 d
Finished Goods
OUT
1.50 d
VA 3.7 h
2.00 d
VA 4.7 h
2.50 d
VA 6.1 h
1.25 d
VA 4.2 h
1.00 d
VA 3.8 h
1.50 d
Total Lead Time
10.7 d
VA Time
22.4 h
PCE
9.28%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen