Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Full-Fuselage PTFE Aerospace Cable Harness
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.14 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.55%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Mil-38999 Crimp & Back-Shell
20 < 28/day
Limit: downtime
Mil-38999 Crimp & Back-Shell: capacity 20/day vs demand 28/day. Main limit: downtime. Raw C/T 34.7 min, effective C/T 43.5 min.
Quality (RTY)
87.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€856,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
24.6 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Aerospace cable suppl…
Silver-Plated PTFE Wire
Weekly · LT 18d
PRODUCTION CONTROL / ERP
Harness MES
Serial Lot Qualification Push
CUSTOMER
Final Aircraft Wiring…
28 assemblies/d
Takt: 32.1 min
EDI / 2x / week
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
42
1.50 d
Drag to reorder step 1
AVIONICS SMT
1. UV Laser Wire Ma…
×2
Push Flow
C/T
23.2 min
C/O
35 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
22 / 2d
OEE
87.7%
i
Insert a step here
+
I
45
1.61 d
Drag to reorder step 2
CLASS-3 BENCH
2. Braiding & Arami…
×4
Push Flow
C/T
26.4 min
C/O
15 min
Availability
92%
Quality FPY
96.8%
Batch / EPEI
14 / 1d
OEE
86.1%
i
Insert a step here
+
I
67
2.39 d
SMED
Parallel …
Drag to reorder step 3
ENV CHAMBER
3. Mil-38999 Crimp …
×2
BOTTLENECK
C/T
34.7 min
C/O
45 min
Availability
85%
Quality FPY
93.8%
Batch / EPEI
28 / 2d
OEE
75.7%
i
Insert a step here
+
I
31
1.11 d
Drag to reorder step 4
ENCLOSURE
4. EMI Shield Termi…
×2
FIFO Lane
C/T
22.5 min
C/O
20 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
11 / 1d
OEE
88.3%
i
FIFO
Insert a step here
+
I
25
0.89 d
Drag to reorder step 5
FLIGHT CERT
5. 1500V Hipot & Pi…
×2
Continuous Flow
C/T
20.6 min
C/O
12 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
7 / 1d
OEE
90.1%
i
Insert a step at the end
+
I
42
1.50 d
Finished Goods
OUT
1.50 d
VA 23.2 min
1.61 d
VA 26.4 min
2.39 d
VA 34.7 min
1.11 d
VA 22.5 min
0.89 d
VA 20.6 min
1.50 d
Total Lead Time
9.14 d
VA Time
2.1 h
PCE
1.55%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step