Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
50.0 min
Lead Time (LT)
12.8 d
Value-Added
3.3 h
Efficiency (PCE)
1.72%
Bottleneck5-Axis Oil Gallery Drill
12 < 18/day
Limit: downtime
Quality (RTY)
89.1%
WIP Capital
€658,300
Carbon CO₂
61.6 t CO₂e/year