Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Part-145 Avionics LRU Bench Repair & Mod
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
20.4 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.50%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Conformal Touch-Up & Bake
18 < 28/day
Limit: downtime
Conformal Touch-Up & Bake: capacity 18/day vs demand 28/day. Main limit: downtime. Raw C/T 22.4 min, effective C/T 29.9 min.
Quality (RTY)
84.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€167,680
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
39.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Airline Line Stations
Unserviceable Cockpit U…
Daily AOG Courier · LT 3d
PRODUCTION CONTROL / ERP
MRO ERP
NRC Queue Bottleneck
CUSTOMER
Global AOG Parts Desk
28 units/d
Takt: 20.4 min
EDI / Slot Ferry Flight
MRP / Daily AOG Courier
★ PACEMAKER
IN
Insert a step at the start
+
I
39
1.39 d
Drag to reorder step 1
DOCK 1
1. Bench Diagnostic…
×4
FIFO Lane
C/T
14.3 min
C/O
20 min
Availability
95%
Quality FPY
97.5%
Batch / EPEI
14 / 1d
OEE
86.1%
i
FIFO
Insert a step here
+
I
50
1.79 d
Drag to reorder step 2
WASH BAY
2. BGA Rework & Mod…
×3
Push Flow
C/T
15.9 min
C/O
25 min
Availability
92%
Quality FPY
98.1%
Batch / EPEI
22 / 1d
OEE
85.2%
i
Insert a step here
+
I
90
3.21 d
FLOW
Dedicated…
Drag to reorder step 3
REPAIR SHOP
3. Conformal Touch-…
×6
BOTTLENECK
C/T
22.4 min
C/O
40 min
Availability
82%
Quality FPY
91.5%
Batch / EPEI
28 / 2d
OEE
69.8%
i
Insert a step here
+
I
39
1.39 d
Drag to reorder step 4
HANGAR BAY
4. ATE Automated Te…
×5
FIFO Lane
C/T
16.3 min
C/O
20 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
11 / 1d
OEE
82.7%
i
FIFO
Insert a step here
+
I
22
0.79 d
Drag to reorder step 5
CRS RELEASE
5. Dual EASA/FAA 81…
×2
Continuous Flow
C/T
12.2 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
6 / 1d
OEE
88.3%
i
Insert a step at the end
+
I
22
0.79 d
Finished Goods
OUT
1.39 d
VA 14.3 min
1.79 d
VA 15.9 min
3.21 d
VA 22.4 min
1.39 d
VA 16.3 min
0.79 d
VA 12.2 min
0.79 d
Total Lead Time
9.50 d
VA Time
1.4 h
PCE
1.50%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step