Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Widebody Whole-Aircraft Strip & Livery Paint
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
14.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
12.0 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
56.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
16.60%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Epoxy Primer Electro-Coat
1 < 2/day
Limit: downtime
Epoxy Primer Electro-Coat: capacity 1/day vs demand 2/day. Main limit: downtime. Raw C/T 15.7 h, effective C/T 20.9 h.
Quality (RTY)
84.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€580,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
2.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Aerospace coatings su…
Chromate-Free Primer & …
Daily AOG Courier · LT 3d
PRODUCTION CONTROL / ERP
MRO Scheduler
NRC Queue Bottleneck
CUSTOMER
Airline Delivery Cent…
2 units/d
Takt: 14.3 h
EDI / Slot Ferry Flight
MRP / Daily AOG Courier
★ PACEMAKER
IN
Insert a step at the start
+
I
3
1.50 d
Drag to reorder step 1
DOCK 1
1. Mask Glass & Las…
×4
FIFO Lane
C/T
10.0 h
C/O
20 min
Availability
95%
Quality FPY
97.5%
Batch / EPEI
1 / 1d
OEE
91.5%
i
FIFO
Insert a step here
+
I
4
2.00 d
Drag to reorder step 2
WASH BAY
2. Chromate Wash & …
×3
Push Flow
C/T
11.1 h
C/O
25 min
Availability
92%
Quality FPY
98.1%
Batch / EPEI
2 / 1d
OEE
88.9%
i
Insert a step here
+
I
6
3.00 d
FLOW
Dedicated…
Drag to reorder step 3
REPAIR SHOP
3. Epoxy Primer Ele…
×6
BOTTLENECK
C/T
15.7 h
C/O
40 min
Availability
82%
Quality FPY
91.5%
Batch / EPEI
2 / 2d
OEE
73.3%
i
Insert a step here
+
I
3
1.50 d
Drag to reorder step 4
HANGAR BAY
4. Stencil Basecoat…
×5
FIFO Lane
C/T
11.4 h
C/O
20 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
1 / 1d
OEE
89.7%
i
FIFO
Insert a step here
+
I
2
1.00 d
Drag to reorder step 5
CRS RELEASE
5. Stall Marking & …
×2
Continuous Flow
C/T
8.6 h
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
1 / 1d
OEE
95.6%
i
Insert a step at the end
+
I
2
1.00 d
Finished Goods
OUT
1.50 d
VA 10.0 h
2.00 d
VA 11.1 h
3.00 d
VA 15.7 h
1.50 d
VA 11.4 h
1.00 d
VA 8.6 h
1.00 d
Total Lead Time
12.0 d
VA Time
56.7 h
PCE
16.60%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step