Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
14.3 h
Lead Time (LT)
12.0 d
Value-Added
56.7 h
Efficiency (PCE)
16.60%
BottleneckEpoxy Primer Electro-Coat
1 < 2/day
Limit: downtime
Quality (RTY)
84.6%
WIP Capital
€580,000
Carbon CO₂
2.8 t CO₂e/year