Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
4.8 h
Lead Time (LT)
10.5 d
Value-Added
18.9 h
Efficiency (PCE)
9.48%
BottleneckNon-Routine Structural Fix
3 < 4/day
Limit: downtime
Quality (RTY)
84.6%
WIP Capital
€684,000
Carbon CO₂
5.6 t CO₂e/year