Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
High-Bypass Turbofan Full Performance Overhaul
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
6.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.3 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
25.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
12.85%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Blade Weld & Tip Grind NRC
2 < 3/day
Limit: downtime
Blade Weld & Tip Grind NRC: capacity 2/day vs demand 3/day. Main limit: downtime. Raw C/T 7.0 h, effective C/T 9.3 h.
Quality (RTY)
84.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,296,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Airlines & Engine Les…
Used Commercial Engine …
Daily AOG Courier · LT 3d
PRODUCTION CONTROL / ERP
MRO ERP
NRC Queue Bottleneck
CUSTOMER
Airline Fleet Pools
3 units/d
Takt: 6.3 h
EDI / Slot Ferry Flight
MRP / Daily AOG Courier
★ PACEMAKER
IN
Insert a step at the start
+
I
4
1.33 d
Drag to reorder step 1
DOCK 1
1. Complete Module …
×4
FIFO Lane
C/T
4.4 h
C/O
20 min
Availability
95%
Quality FPY
97.5%
Batch / EPEI
2 / 1d
OEE
90.2%
i
FIFO
Insert a step here
+
I
5
1.67 d
Drag to reorder step 2
WASH BAY
2. Chem Strip, FPI …
×3
Push Flow
C/T
4.9 h
C/O
25 min
Availability
92%
Quality FPY
98.1%
Batch / EPEI
2 / 1d
OEE
87.3%
i
Insert a step here
+
I
10
3.33 d
FLOW
Dedicated…
Drag to reorder step 3
REPAIR SHOP
3. Blade Weld & Tip…
×6
BOTTLENECK
C/T
7.0 h
C/O
40 min
Availability
82%
Quality FPY
91.5%
Batch / EPEI
3 / 2d
OEE
72.4%
i
Insert a step here
+
I
4
1.33 d
Drag to reorder step 4
HANGAR BAY
4. Fan/Core/LPT Mod…
×5
FIFO Lane
C/T
5.1 h
C/O
20 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
1 / 1d
OEE
89.2%
i
FIFO
Insert a step here
+
I
2
0.67 d
Drag to reorder step 5
CRS RELEASE
5. Sea-Level Pass-O…
×2
Continuous Flow
C/T
3.8 h
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
1 / 1d
OEE
95.3%
i
Insert a step at the end
+
I
2
0.67 d
Finished Goods
OUT
1.33 d
VA 4.4 h
1.67 d
VA 4.9 h
3.33 d
VA 7.0 h
1.33 d
VA 5.1 h
0.67 d
VA 3.8 h
0.67 d
Total Lead Time
10.3 d
VA Time
25.2 h
PCE
12.85%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step