Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Turboprop 6-Blade Composite Propeller Overhaul
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
57.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.80 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.8 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
4.06%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Blade Erosion Boot & Balance
6 < 10/day
Limit: downtime
Blade Erosion Boot & Balance: capacity 6/day vs demand 10/day. Main limit: downtime. Raw C/T 1.0 h, effective C/T 1.4 h.
Quality (RTY)
84.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€451,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
13.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Turboprop operators
In-Service Hub & Blade …
Daily AOG Courier · LT 3d
PRODUCTION CONTROL / ERP
MRO ERP
NRC Queue Bottleneck
CUSTOMER
Regional Airline Flee…
10 assemblies/d
Takt: 57.0 min
EDI / Slot Ferry Flight
MRP / Daily AOG Courier
★ PACEMAKER
IN
Insert a step at the start
+
I
14
1.40 d
Drag to reorder step 1
DOCK 1
1. Blade Pull & Pit…
×4
FIFO Lane
C/T
39.9 min
C/O
20 min
Availability
95%
Quality FPY
97.5%
Batch / EPEI
5 / 1d
OEE
86.1%
i
FIFO
Insert a step here
+
I
18
1.80 d
Drag to reorder step 2
WASH BAY
2. Magnetic Particl…
×3
Push Flow
C/T
44.5 min
C/O
25 min
Availability
92%
Quality FPY
98.1%
Batch / EPEI
8 / 1d
OEE
85.3%
i
Insert a step here
+
I
32
3.20 d
FLOW
Dedicated…
Drag to reorder step 3
REPAIR SHOP
3. Blade Erosion Bo…
×6
BOTTLENECK
C/T
1.0 h
C/O
40 min
Availability
82%
Quality FPY
91.5%
Batch / EPEI
10 / 2d
OEE
69.8%
i
Insert a step here
+
I
14
1.40 d
Drag to reorder step 4
HANGAR BAY
4. Pitch Servo Rig …
×5
FIFO Lane
C/T
45.6 min
C/O
20 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
4 / 1d
OEE
82.8%
i
FIFO
Insert a step here
+
I
8
0.80 d
Drag to reorder step 5
CRS RELEASE
5. Static Dynamic M…
×2
Continuous Flow
C/T
34.2 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
87.7%
i
Insert a step at the end
+
I
8
0.80 d
Finished Goods
OUT
1.40 d
VA 39.9 min
1.80 d
VA 44.5 min
3.20 d
VA 1.0 h
1.40 d
VA 45.6 min
0.80 d
VA 34.2 min
0.80 d
Total Lead Time
9.80 d
VA Time
3.8 h
PCE
4.06%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step