Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Composite Thrust Reverser Acoustic Patch
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.4 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.75 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
9.5 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
5.10%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Hot-Bonder Vacuum Cure Patch
5 < 8/day
Limit: downtime
Hot-Bonder Vacuum Cure Patch: capacity 5/day vs demand 8/day. Main limit: downtime. Raw C/T 2.6 h, effective C/T 3.5 h.
Quality (RTY)
84.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€310,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
11.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Engine Shop Feeder
Delaminated Cowl Halves
Daily AOG Courier · LT 3d
PRODUCTION CONTROL / ERP
MRO ERP
NRC Queue Bottleneck
CUSTOMER
Engine Podding Shop
8 units/d
Takt: 2.4 h
EDI / Slot Ferry Flight
MRP / Daily AOG Courier
★ PACEMAKER
IN
Insert a step at the start
+
I
11
1.38 d
Drag to reorder step 1
DOCK 1
1. Tap-Test & UT De…
×4
FIFO Lane
C/T
1.7 h
C/O
20 min
Availability
95%
Quality FPY
97.5%
Batch / EPEI
4 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
14
1.75 d
Drag to reorder step 2
WASH BAY
2. Corroded Honeyco…
×3
Push Flow
C/T
1.9 h
C/O
25 min
Availability
92%
Quality FPY
98.1%
Batch / EPEI
6 / 1d
OEE
87.6%
i
Insert a step here
+
I
26
3.25 d
FLOW
Dedicated…
Drag to reorder step 3
REPAIR SHOP
3. Hot-Bonder Vacuu…
×6
BOTTLENECK
C/T
2.6 h
C/O
40 min
Availability
82%
Quality FPY
91.5%
Batch / EPEI
8 / 2d
OEE
72.4%
i
Insert a step here
+
I
11
1.38 d
Drag to reorder step 4
HANGAR BAY
4. Actuator Seal & …
×5
FIFO Lane
C/T
1.9 h
C/O
20 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
3 / 1d
OEE
86.5%
i
FIFO
Insert a step here
+
I
6
0.75 d
Drag to reorder step 5
CRS RELEASE
5. C-Scan Integrity…
×2
Continuous Flow
C/T
1.4 h
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
2 / 1d
OEE
92.8%
i
Insert a step at the end
+
I
6
0.75 d
Finished Goods
OUT
1.38 d
VA 1.7 h
1.75 d
VA 1.9 h
3.25 d
VA 2.6 h
1.38 d
VA 1.9 h
0.75 d
VA 1.4 h
0.75 d
Total Lead Time
9.75 d
VA Time
9.5 h
PCE
5.10%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step