Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
35.6 min
Lead Time (LT)
9.56 d
Value-Added
2.4 h
Efficiency (PCE)
1.30%
BottleneckFR Leather Dress-Cover Fit
21 < 32/day
Limit: downtime
Quality (RTY)
84.6%
WIP Capital
€407,700
Carbon CO₂
44.5 t CO₂e/year