Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
High-Temp Bleed Air & Starter Valve Rebuild
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
13.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
51.6 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.95%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Spring & Actuator Calibration
28 < 44/day
Limit: downtime
Spring & Actuator Calibration: capacity 28/day vs demand 44/day. Main limit: downtime. Raw C/T 14.3 min, effective C/T 19.0 min.
Quality (RTY)
84.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€198,720
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
61.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Rotables Brokers
Seized Engine Bleed Val…
Daily AOG Courier · LT 3d
PRODUCTION CONTROL / ERP
MRO ERP
NRC Queue Bottleneck
CUSTOMER
Line Maintenance Pools
44 units/d
Takt: 13.0 min
EDI / Slot Ferry Flight
MRP / Daily AOG Courier
★ PACEMAKER
IN
Insert a step at the start
+
I
62
1.41 d
Drag to reorder step 1
DOCK 1
1. Ultrasonic Carbo…
×4
FIFO Lane
C/T
9.1 min
C/O
20 min
Availability
95%
Quality FPY
97.5%
Batch / EPEI
22 / 1d
OEE
86.1%
i
FIFO
Insert a step here
+
I
79
1.80 d
Drag to reorder step 2
WASH BAY
2. Piston & Butterf…
×3
Push Flow
C/T
10.1 min
C/O
25 min
Availability
92%
Quality FPY
98.1%
Batch / EPEI
35 / 1d
OEE
85.3%
i
Insert a step here
+
I
141
3.20 d
FLOW
Dedicated…
Drag to reorder step 3
REPAIR SHOP
3. Spring & Actuato…
×6
BOTTLENECK
C/T
14.3 min
C/O
40 min
Availability
82%
Quality FPY
91.5%
Batch / EPEI
44 / 2d
OEE
69.8%
i
Insert a step here
+
I
62
1.41 d
Drag to reorder step 4
HANGAR BAY
4. 750°F High-Temp …
×5
FIFO Lane
C/T
10.4 min
C/O
20 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
18 / 1d
OEE
83.0%
i
FIFO
Insert a step here
+
I
35
0.80 d
Drag to reorder step 5
CRS RELEASE
5. 8130-3 Airworthi…
×2
Continuous Flow
C/T
7.8 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
9 / 1d
OEE
87.9%
i
Insert a step at the end
+
I
35
0.80 d
Finished Goods
OUT
1.41 d
VA 9.1 min
1.80 d
VA 10.1 min
3.20 d
VA 14.3 min
1.41 d
VA 10.4 min
0.80 d
VA 7.8 min
0.80 d
Total Lead Time
9.50 d
VA Time
51.6 min
PCE
0.95%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step