Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Carbon Disc Wheel & Brake MRO Turnaround
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
13.4 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.45 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
53.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.50%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Bead-Seat Seal & New Nitrogen
56 < 85/day
Limit: downtime
Bead-Seat Seal & New Nitrogen: capacity 56/day vs demand 85/day. Main limit: downtime. Raw C/T 14.8 min, effective C/T 19.7 min.
Quality (RTY)
84.6%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€415,480
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
118.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Turnaround Line Stati…
Worn Tire & Brake Assem…
Daily AOG Courier · LT 3d
PRODUCTION CONTROL / ERP
Business ERP
NRC Queue Bottleneck
CUSTOMER
Airline Hub Ramp
85 units/d
Takt: 13.4 min
EDI / Slot Ferry Flight
MRP / Daily AOG Courier
★ PACEMAKER
IN
Insert a step at the start
+
I
119
1.40 d
Drag to reorder step 1
DOCK 1
1. Deflate, Dismoun…
×4
FIFO Lane
C/T
9.4 min
C/O
20 min
Availability
95%
Quality FPY
97.5%
Batch / EPEI
43 / 1d
OEE
89.4%
i
FIFO
Insert a step here
+
I
153
1.80 d
Drag to reorder step 2
WASH BAY
2. Eddy Current Rim…
×3
Push Flow
C/T
10.5 min
C/O
25 min
Availability
92%
Quality FPY
98.1%
Batch / EPEI
68 / 1d
OEE
87.8%
i
Insert a step here
+
I
272
3.20 d
FLOW
Dedicated…
Drag to reorder step 3
REPAIR SHOP
3. Bead-Seat Seal &…
×6
BOTTLENECK
C/T
14.8 min
C/O
40 min
Availability
82%
Quality FPY
91.5%
Batch / EPEI
85 / 2d
OEE
72.4%
i
Insert a step here
+
I
119
1.40 d
Drag to reorder step 4
HANGAR BAY
4. Carbon Rotor Thi…
×5
FIFO Lane
C/T
10.7 min
C/O
20 min
Availability
93%
Quality FPY
97.6%
Batch / EPEI
34 / 1d
OEE
86.8%
i
FIFO
Insert a step here
+
I
68
0.80 d
Drag to reorder step 5
CRS RELEASE
5. Leak & Torque Ro…
×2
Continuous Flow
C/T
8.1 min
C/O
10 min
Availability
97%
Quality FPY
99.1%
Batch / EPEI
17 / 1d
OEE
91.9%
i
Insert a step at the end
+
I
68
0.80 d
Finished Goods
OUT
1.40 d
VA 9.4 min
1.80 d
VA 10.5 min
3.20 d
VA 14.8 min
1.40 d
VA 10.7 min
0.80 d
VA 8.1 min
0.80 d
Total Lead Time
9.45 d
VA Time
53.4 min
PCE
0.50%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen