Cooled Nozzle Guide Vane Stator Sector
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
17.3 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.4 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.69%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Water-Flow Cooling Verify
35 < 52/day
Limit: downtime
Water-Flow Cooling Verify: capacity 35/day vs demand 52/day. Main limit: downtime. Raw C/T 18.7 min, effective C/T 23.9 min.
Quality (RTY)
85.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,878,400
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
452.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Investment-casting fo…
Cobalt-Alloy Equiaxed C…
Weekly · LT 21d
PRODUCTION CONTROL / ERP
Aerospace ERP
Engine Serial Synchronization
CUSTOMER
Turbine Stage 1 Assem…
52 parts/d
Takt: 17.3 min
EDI / Weekly Stand
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
130
2.50 d
Drag to reorder step 1
FOUNDRY
1. EDM Airfoil Datu…
×2
Push Flow
C/T
12.5 min
C/O
40 min
Availability
92%
Quality FPY
96.4%
Batch / EPEI
104 / 3d
OEE
86.7%
i
Insert a step here
+
I
114
2.19 d
Drag to reorder step 2
GRIND CELL
2. High-Temp Vacuum…
×2
Push Flow
C/T
14.5 min
C/O
50 min
Availability
89%
Quality FPY
97.1%
Batch / EPEI
52 / 2d
OEE
81.6%
i
Insert a step here
+
I
135
2.60 d
AUTOMATION
Multi-Axi…
Drag to reorder step 3
THERMAL EDM
3. Water-Flow Cooli…
×2
BOTTLENECK
C/T
18.7 min
C/O
65 min
Availability
83%
Quality FPY
94.2%
Batch / EPEI
52 / 3d
OEE
72.5%
i
Insert a step here
+
I
73
1.40 d
Drag to reorder step 4
MODULE STACK
4. TBC Ceramic Coat…
×2
FIFO Lane
C/T
13.2 min
C/O
30 min
Availability
92%
Quality FPY
98.0%
Batch / EPEI
26 / 1d
OEE
84.1%
i
FIFO
Insert a step here
+
I
57
1.10 d
Drag to reorder step 5
TEST CELL
5. Airflow Throat A…
×3
FIFO Lane
C/T
11.3 min
C/O
45 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
26 / 1d
OEE
83.6%
i
Insert a step at the end
+
I
78
1.50 d
Finished Goods
OUT
2.50 d
VA 12.5 min
2.19 d
VA 14.5 min
2.60 d
VA 18.7 min
1.40 d
VA 13.2 min
1.10 d
VA 11.3 min
1.50 d
Total Lead Time
11.4 d
VA Time
1.2 h
PCE
0.69%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step