Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Smart Heated Pitot-Static Air Data Probe
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
8.2 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.04 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
32.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.40%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Air-Data Pressure Transducer
77 < 110/day
Limit: downtime
Air-Data Pressure Transducer: capacity 77/day vs demand 110/day. Main limit: downtime. Raw C/T 8.8 min, effective C/T 11.1 min.
Quality (RTY)
87.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,633,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
96.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Nickel-alloy & seamle…
Electroformed Probes & …
Weekly · LT 18d
PRODUCTION CONTROL / ERP
Business ERP
Serial Lot Qualification Push
CUSTOMER
Nose Fuselage Station
110 units/d
Takt: 8.2 min
EDI / 2x / week
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
165
1.50 d
Drag to reorder step 1
AVIONICS SMT
1. Nickel-Alloy Swa…
×2
Push Flow
C/T
5.9 min
C/O
35 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
88 / 2d
OEE
87.8%
i
Insert a step here
+
I
176
1.60 d
Drag to reorder step 2
CLASS-3 BENCH
2. Mineral-Insulate…
×4
Push Flow
C/T
6.7 min
C/O
15 min
Availability
92%
Quality FPY
96.8%
Batch / EPEI
55 / 1d
OEE
86.1%
i
Insert a step here
+
I
264
2.40 d
SMED
Parallel …
Drag to reorder step 3
ENV CHAMBER
3. Air-Data Pressur…
×2
BOTTLENECK
C/T
8.8 min
C/O
45 min
Availability
85%
Quality FPY
93.8%
Batch / EPEI
110 / 2d
OEE
75.7%
i
Insert a step here
+
I
121
1.10 d
Drag to reorder step 4
ENCLOSURE
4. Icing Wind-Tunne…
×2
FIFO Lane
C/T
5.7 min
C/O
20 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
44 / 1d
OEE
88.4%
i
FIFO
Insert a step here
+
I
99
0.90 d
Drag to reorder step 5
FLIGHT CERT
5. Zero-Drift Baro …
×2
Continuous Flow
C/T
5.2 min
C/O
12 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
28 / 1d
OEE
90.2%
i
Insert a step at the end
+
I
165
1.50 d
Finished Goods
OUT
1.50 d
VA 5.9 min
1.60 d
VA 6.7 min
2.40 d
VA 8.8 min
1.10 d
VA 5.7 min
0.90 d
VA 5.2 min
1.50 d
Total Lead Time
9.04 d
VA Time
32.4 min
PCE
0.40%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen