Ti-5553 Engine Mount Pylon Drag Fitting
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
40.9 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
12.8 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.7 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.42%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Finish Spherical Bore Grind
15 < 22/day
Limit: downtime
Finish Spherical Bore Grind: capacity 15/day vs demand 22/day. Main limit: downtime. Raw C/T 44.2 min, effective C/T 56.0 min.
Quality (RTY)
89.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€664,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
75.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Beta titanium forge
Beta Titanium Forgings
Weekly · LT 14d
PRODUCTION CONTROL / ERP
Aerospace ERP
AS9100 Traveler Push
CUSTOMER
Nacelle & Pylon Sub-A…
22 parts/d
Takt: 40.9 min
EDI / 3x / week
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
48
2.18 d
Drag to reorder step 1
SAW PREP
1. UT Volumetric Im…
×1
Push Flow
C/T
24.6 min
C/O
25 min
Availability
96%
Quality FPY
99.4%
Batch / EPEI
44 / 2d
OEE
94.1%
i
Insert a step here
+
I
53
2.41 d
Drag to reorder step 2
CNC BAY
2. Heavy Hog-Out 5-…
×2
Push Flow
C/T
31.9 min
C/O
35 min
Availability
92%
Quality FPY
98.5%
Batch / EPEI
33 / 2d
OEE
88.3%
i
Insert a step here
+
I
62
2.82 d
SMED
Zero-Poin…
Drag to reorder step 3
PRECISION CELL
3. Finish Spherical…
×2
BOTTLENECK
C/T
44.2 min
C/O
85 min
Availability
83%
Quality FPY
95.0%
Batch / EPEI
22 / 3d
OEE
71.4%
i
Insert a step here
+
I
48
2.18 d
Drag to reorder step 4
SPECIAL PROCESS
4. Penetrant FPI Da…
×1
Push Flow
C/T
33.6 min
C/O
30 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
33 / 2d
OEE
89.3%
i
Insert a step here
+
I
26
1.18 d
Drag to reorder step 5
AS9100 QUALITY
5. Laser Metrology …
×2
FIFO Lane
C/T
28.6 min
C/O
15 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
11 / 1d
OEE
89.6%
i
Insert a step at the end
+
I
40
1.82 d
Finished Goods
OUT
2.18 d
VA 24.6 min
2.41 d
VA 31.9 min
2.82 d
VA 44.2 min
2.18 d
VA 33.6 min
1.18 d
VA 28.6 min
1.82 d
Total Lead Time
12.8 d
VA Time
2.7 h
PCE
1.42%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen