Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
AESA Airborne Phased-Array Radar Antenna
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
45.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.40 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
4.21%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Liquid Cold-Plate Integration
7 < 10/day
Limit: downtime
Liquid Cold-Plate Integration: capacity 7/day vs demand 10/day. Main limit: downtime. Raw C/T 48.6 min, effective C/T 1.0 h.
Quality (RTY)
87.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,160,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
8.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
GaN RF-device supplier
GaN MMIC Dies & LTCC Su…
Weekly · LT 18d
PRODUCTION CONTROL / ERP
MES
Serial Lot Qualification Push
CUSTOMER
Fighter & Patrol Airc…
10 units/d
Takt: 45.0 min
EDI / 2x / week
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
15
1.50 d
Drag to reorder step 1
AVIONICS SMT
1. Die Attach AuSn …
×2
Push Flow
C/T
32.4 min
C/O
35 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
8 / 2d
OEE
83.3%
i
Insert a step here
+
I
16
1.60 d
Drag to reorder step 2
CLASS-3 BENCH
2. Ribbon Bond Clea…
×4
Push Flow
C/T
36.9 min
C/O
15 min
Availability
92%
Quality FPY
96.8%
Batch / EPEI
5 / 1d
OEE
83.1%
i
Insert a step here
+
I
24
2.40 d
SMED
Parallel …
Drag to reorder step 3
ENV CHAMBER
3. Liquid Cold-Plat…
×2
BOTTLENECK
C/T
48.6 min
C/O
45 min
Availability
85%
Quality FPY
93.8%
Batch / EPEI
10 / 2d
OEE
71.8%
i
Insert a step here
+
I
11
1.10 d
Drag to reorder step 4
ENCLOSURE
4. Hermetic Seam-Se…
×2
FIFO Lane
C/T
31.5 min
C/O
20 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
4 / 1d
OEE
83.2%
i
FIFO
Insert a step here
+
I
9
0.90 d
Drag to reorder step 5
FLIGHT CERT
5. Near-Field Anech…
×2
Continuous Flow
C/T
28.8 min
C/O
12 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
3 / 1d
OEE
86.7%
i
Insert a step at the end
+
I
15
1.50 d
Finished Goods
OUT
1.50 d
VA 32.4 min
1.60 d
VA 36.9 min
2.40 d
VA 48.6 min
1.10 d
VA 31.5 min
0.90 d
VA 28.8 min
1.50 d
Total Lead Time
9.40 d
VA Time
3.0 h
PCE
4.21%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step