Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
CFRP Aluminum-Honeycomb Satellite Solar Bus
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
45.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.5 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.80%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Autoclave Structural Bond
7 < 10/day
Limit: downtime
Autoclave Structural Bond: capacity 7/day vs demand 10/day. Main limit: downtime. Raw C/T 48.6 min, effective C/T 1.0 h.
Quality (RTY)
86.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,131,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
35.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Pitch-carbon fiber su…
High-Modulus Carbon Pre…
Weekly -18°C · LT 12d
PRODUCTION CONTROL / ERP
Space MES
Autoclave Batch Load
CUSTOMER
Cleanroom Spacecraft …
10 parts/d
Takt: 45.0 min
EDI / 2x / week
MRP / Weekly -18°C
★ PACEMAKER
IN
Insert a step at the start
+
I
16
1.60 d
Drag to reorder step 1
CLEANROOM PLY
1. Cleanroom Face-S…
×2
FIFO Lane
C/T
29.3 min
C/O
20 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
10 / 2d
OEE
89.9%
i
FIFO
Insert a step here
+
I
20
2.00 d
Drag to reorder step 2
LAYUP ROOM
2. Perforated Al Co…
×2
Push Flow
C/T
37.8 min
C/O
45 min
Availability
90%
Quality FPY
97.2%
Batch / EPEI
8 / 2d
OEE
76.5%
i
Insert a step here
+
I
26
2.60 d
SMED
Quick Vac…
Drag to reorder step 3
CURE DECK
3. Autoclave Struct…
×2
BOTTLENECK
C/T
48.6 min
C/O
60 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
15 / 3d
OEE
72.6%
i
Insert a step here
+
I
13
1.30 d
Drag to reorder step 4
TRIM BAY
4. Ti Potting Inser…
×2
FIFO Lane
C/T
33.3 min
C/O
25 min
Availability
93%
Quality FPY
97.8%
Batch / EPEI
5 / 1d
OEE
80.8%
i
FIFO
Insert a step here
+
I
11
1.10 d
Drag to reorder step 5
NDT LAB
5. Outgassing & Fla…
×2
FIFO Lane
C/T
30.6 min
C/O
15 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
5 / 1d
OEE
85.8%
i
Insert a step at the end
+
I
15
1.50 d
Finished Goods
OUT
1.60 d
VA 29.3 min
2.00 d
VA 37.8 min
2.60 d
VA 48.6 min
1.30 d
VA 33.3 min
1.10 d
VA 30.6 min
1.50 d
Total Lead Time
10.5 d
VA Time
3.0 h
PCE
3.80%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen