Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Ka-Band LEO Satellite Payload Transponder
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
28.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.25 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.9 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.68%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Laser Hermetic Lid Seal
11 < 16/day
Limit: downtime
Laser Hermetic Lid Seal: capacity 11/day vs demand 16/day. Main limit: downtime. Raw C/T 30.4 min, effective C/T 38.1 min.
Quality (RTY)
87.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€4,896,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
14.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Rad-hard RF supplier
GaAs MMICs & Fe-Ni-Co A…
Weekly · LT 18d
PRODUCTION CONTROL / ERP
Space PLM/MES
Serial Lot Qualification Push
CUSTOMER
Spacecraft Integratio…
16 units/d
Takt: 28.1 min
EDI / 2x / week
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
24
1.50 d
Drag to reorder step 1
AVIONICS SMT
1. Gold-Plated Fe-N…
×2
Push Flow
C/T
20.3 min
C/O
35 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
13 / 2d
OEE
83.5%
i
Insert a step here
+
I
26
1.63 d
Drag to reorder step 2
CLASS-3 BENCH
2. Chip-and-Wire Cl…
×4
Push Flow
C/T
23.1 min
C/O
15 min
Availability
92%
Quality FPY
96.8%
Batch / EPEI
8 / 1d
OEE
83.1%
i
Insert a step here
+
I
38
2.38 d
SMED
Parallel …
Drag to reorder step 3
ENV CHAMBER
3. Laser Hermetic L…
×2
BOTTLENECK
C/T
30.4 min
C/O
45 min
Availability
85%
Quality FPY
93.8%
Batch / EPEI
16 / 2d
OEE
71.8%
i
Insert a step here
+
I
18
1.13 d
Drag to reorder step 4
ENCLOSURE
4. 14-Day Thermal V…
×2
FIFO Lane
C/T
19.7 min
C/O
20 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
6 / 1d
OEE
82.5%
i
FIFO
Insert a step here
+
I
14
0.88 d
Drag to reorder step 5
FLIGHT CERT
5. PIM Intermod & P…
×2
Continuous Flow
C/T
18.0 min
C/O
12 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
4 / 1d
OEE
85.0%
i
Insert a step at the end
+
I
24
1.50 d
Finished Goods
OUT
1.50 d
VA 20.3 min
1.63 d
VA 23.1 min
2.38 d
VA 30.4 min
1.13 d
VA 19.7 min
0.88 d
VA 18.0 min
1.50 d
Total Lead Time
9.25 d
VA Time
1.9 h
PCE
2.68%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step