Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
7150 Aluminum Extruded Cabin Seat Track
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.6 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
12.6 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
22.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.20%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
5-Axis Lug & Weight Pocket
106 < 160/day
Limit: downtime
5-Axis Lug & Weight Pocket: capacity 106/day vs demand 160/day. Main limit: downtime. Raw C/T 6.1 min, effective C/T 7.7 min.
Quality (RTY)
89.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€393,120
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
547.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Aluminum extrusion ho…
7150-T77511 Profiles
Weekly · LT 14d
PRODUCTION CONTROL / ERP
Business ERP
AS9100 Traveler Push
CUSTOMER
Fuselage Floor Grid L…
160 parts/d
Takt: 5.6 min
EDI / 3x / week
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
352
2.20 d
Drag to reorder step 1
SAW PREP
1. Saw Length & End…
×1
Push Flow
C/T
3.4 min
C/O
25 min
Availability
96%
Quality FPY
99.4%
Batch / EPEI
320 / 2d
OEE
94.1%
i
Insert a step here
+
I
384
2.40 d
Drag to reorder step 2
CNC BAY
2. High-Speed Pitch…
×2
Push Flow
C/T
4.4 min
C/O
35 min
Availability
92%
Quality FPY
98.5%
Batch / EPEI
240 / 2d
OEE
88.3%
i
Insert a step here
+
I
448
2.80 d
SMED
Zero-Poin…
Drag to reorder step 3
PRECISION CELL
3. 5-Axis Lug & Wei…
×2
BOTTLENECK
C/T
6.1 min
C/O
85 min
Availability
83%
Quality FPY
95.0%
Batch / EPEI
160 / 3d
OEE
71.4%
i
Insert a step here
+
I
352
2.20 d
Drag to reorder step 4
SPECIAL PROCESS
4. Sulfuric Clear A…
×1
Push Flow
C/T
4.6 min
C/O
30 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
240 / 2d
OEE
89.3%
i
Insert a step here
+
I
192
1.20 d
Drag to reorder step 5
AS9100 QUALITY
5. Go/No-Go Pin Pit…
×2
FIFO Lane
C/T
3.9 min
C/O
15 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
80 / 1d
OEE
89.6%
i
Insert a step at the end
+
I
288
1.80 d
Finished Goods
OUT
2.20 d
VA 3.4 min
2.40 d
VA 4.4 min
2.80 d
VA 6.1 min
2.20 d
VA 4.6 min
1.20 d
VA 3.9 min
1.80 d
Total Lead Time
12.6 d
VA Time
22.4 min
PCE
0.20%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step