Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
30-Meter Long-Bed Wing Spar Milling
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.8 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
13.1 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
11.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.79%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Stress-Relief Cryo Stabilize
5 < 8/day
Limit: downtime
Stress-Relief Cryo Stabilize: capacity 5/day vs demand 8/day. Main limit: downtime. Raw C/T 3.0 h, effective C/T 3.9 h.
Quality (RTY)
89.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€888,800
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
27.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Aerospace aluminum ex…
2024 Extruded Long Bars
Weekly · LT 14d
PRODUCTION CONTROL / ERP
MES
AS9100 Traveler Push
CUSTOMER
Final Wing Drilling J…
8 parts/d
Takt: 2.8 h
EDI / 3x / week
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
18
2.25 d
Drag to reorder step 1
SAW PREP
1. Ultrasonic Bar I…
×1
Push Flow
C/T
1.7 h
C/O
25 min
Availability
96%
Quality FPY
99.4%
Batch / EPEI
16 / 2d
OEE
94.5%
i
Insert a step here
+
I
19
2.38 d
Drag to reorder step 2
CNC BAY
2. Multi-Spindle Ga…
×2
Push Flow
C/T
2.2 h
C/O
35 min
Availability
92%
Quality FPY
98.5%
Batch / EPEI
12 / 2d
OEE
89.1%
i
Insert a step here
+
I
22
2.75 d
SMED
Zero-Poin…
Drag to reorder step 3
PRECISION CELL
3. Stress-Relief Cr…
×2
BOTTLENECK
C/T
3.0 h
C/O
85 min
Availability
83%
Quality FPY
95.0%
Batch / EPEI
8 / 3d
OEE
73.9%
i
Insert a step here
+
I
18
2.25 d
Drag to reorder step 4
SPECIAL PROCESS
4. Shot-Peen Curvat…
×1
Push Flow
C/T
2.3 h
C/O
30 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
12 / 2d
OEE
90.0%
i
Insert a step here
+
I
10
1.25 d
Drag to reorder step 5
AS9100 QUALITY
5. Laser Tracker Fu…
×2
FIFO Lane
C/T
2.0 h
C/O
15 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
4 / 1d
OEE
90.7%
i
Insert a step at the end
+
I
14
1.75 d
Finished Goods
OUT
2.25 d
VA 1.7 h
2.38 d
VA 2.2 h
2.75 d
VA 3.0 h
2.25 d
VA 2.3 h
1.25 d
VA 2.0 h
1.75 d
Total Lead Time
13.1 d
VA Time
11.2 h
PCE
3.79%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step