Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Main Rotor Helicopter Swashplate Assembly
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.5 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
13.0 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
3.06%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Fretting Tungsten Coat
7 < 10/day
Limit: downtime
Fretting Tungsten Coat: capacity 7/day vs demand 10/day. Main limit: downtime. Raw C/T 1.6 h, effective C/T 2.1 h.
Quality (RTY)
89.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€781,200
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
34.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Titanium forging supp…
Forged Duplex Rings
Weekly · LT 14d
PRODUCTION CONTROL / ERP
Aerospace ERP
AS9100 Traveler Push
CUSTOMER
Rotor Head Final Build
10 assemblies/d
Takt: 1.5 h
EDI / 3x / week
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
22
2.20 d
Drag to reorder step 1
SAW PREP
1. Turn Gimbal Bear…
×1
Push Flow
C/T
54.0 min
C/O
25 min
Availability
96%
Quality FPY
99.4%
Batch / EPEI
20 / 2d
OEE
94.1%
i
Insert a step here
+
I
24
2.40 d
Drag to reorder step 2
CNC BAY
2. Multi-Axis Clevi…
×2
Push Flow
C/T
1.2 h
C/O
35 min
Availability
92%
Quality FPY
98.5%
Batch / EPEI
15 / 2d
OEE
88.3%
i
Insert a step here
+
I
28
2.80 d
SMED
Zero-Poin…
Drag to reorder step 3
PRECISION CELL
3. Fretting Tungste…
×2
BOTTLENECK
C/T
1.6 h
C/O
85 min
Availability
83%
Quality FPY
95.0%
Batch / EPEI
10 / 3d
OEE
71.4%
i
Insert a step here
+
I
22
2.20 d
Drag to reorder step 4
SPECIAL PROCESS
4. Duplex Bearing C…
×1
Push Flow
C/T
1.2 h
C/O
30 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
15 / 2d
OEE
89.3%
i
Insert a step here
+
I
12
1.20 d
Drag to reorder step 5
AS9100 QUALITY
5. 100% Swash Frict…
×2
FIFO Lane
C/T
1.1 h
C/O
15 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
5 / 1d
OEE
89.6%
i
Insert a step at the end
+
I
18
1.80 d
Finished Goods
OUT
2.20 d
VA 54.0 min
2.40 d
VA 1.2 h
2.80 d
VA 1.6 h
2.20 d
VA 1.2 h
1.20 d
VA 1.1 h
1.80 d
Total Lead Time
13.0 d
VA Time
6.0 h
PCE
3.06%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step