Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Single-Crystal Nickel-Superalloy Turbine Blade Cast
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
7.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.3 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
30.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.20%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Bridgman Single-Crystal Cast
124 < 180/day
Limit: downtime
Bridgman Single-Crystal Cast: capacity 124/day vs demand 180/day. Main limit: downtime. Raw C/T 8.1 min, effective C/T 10.4 min.
Quality (RTY)
85.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€3,762,900
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,565.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Single-crystal castin…
Single-Crystal Superall…
Weekly · LT 21d
PRODUCTION CONTROL / ERP
Aerospace ERP
Engine Serial Synchronization
CUSTOMER
High-Pressure Turbine…
180 parts/d
Takt: 7.5 min
EDI / Weekly Stand
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
450
2.50 d
Drag to reorder step 1
FOUNDRY
1. Ceramic Core & W…
×2
Push Flow
C/T
5.4 min
C/O
40 min
Availability
92%
Quality FPY
96.4%
Batch / EPEI
360 / 3d
OEE
87.4%
i
Insert a step here
+
I
396
2.20 d
Drag to reorder step 2
GRIND CELL
2. Robotic Slurry S…
×2
Push Flow
C/T
6.3 min
C/O
50 min
Availability
89%
Quality FPY
97.1%
Batch / EPEI
180 / 2d
OEE
83.2%
i
Insert a step here
+
I
468
2.60 d
AUTOMATION
Multi-Axi…
Drag to reorder step 3
THERMAL EDM
3. Bridgman Single-…
×2
BOTTLENECK
C/T
8.1 min
C/O
65 min
Availability
83%
Quality FPY
94.2%
Batch / EPEI
180 / 3d
OEE
74.4%
i
Insert a step here
+
I
252
1.40 d
Drag to reorder step 4
MODULE STACK
4. Laue X-Ray Cryst…
×2
FIFO Lane
C/T
5.7 min
C/O
30 min
Availability
92%
Quality FPY
98.0%
Batch / EPEI
90 / 1d
OEE
86.2%
i
FIFO
Insert a step here
+
I
198
1.10 d
Drag to reorder step 5
TEST CELL
5. EDM Film-Cool & …
×3
FIFO Lane
C/T
4.9 min
C/O
45 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
90 / 1d
OEE
86.7%
i
Insert a step at the end
+
I
270
1.50 d
Finished Goods
OUT
2.50 d
VA 5.4 min
2.20 d
VA 6.3 min
2.60 d
VA 8.1 min
1.40 d
VA 5.7 min
1.10 d
VA 4.9 min
1.50 d
Total Lead Time
11.3 d
VA Time
30.4 min
PCE
0.20%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step