Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Nickel-Alloy 718 Satellite Thruster Chamber
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
12.8 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.30%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Vacuum Anneal & Mill
14 < 24/day
Limit: changeovers
Vacuum Anneal & Mill: capacity 14/day vs demand 24/day. Main limit: changeovers. Raw C/T 20.3 min, effective C/T 25.7 min.
Quality (RTY)
89.1%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€939,300
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
82.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Superalloy bar produc…
Nickel-Alloy 718 Vacuum…
Weekly · LT 14d
PRODUCTION CONTROL / ERP
Aerospace ERP
AS9100 Traveler Push
CUSTOMER
Spacecraft Propulsion…
24 parts/d
Takt: 18.8 min
EDI / 3x / week
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
53
2.21 d
Drag to reorder step 1
SAW PREP
1. Swiss Turn Injec…
×1
Push Flow
C/T
11.3 min
C/O
25 min
Availability
96%
Quality FPY
99.4%
Batch / EPEI
48 / 2d
OEE
92.8%
i
Insert a step here
+
I
58
2.42 d
Drag to reorder step 2
CNC BAY
2. Electron-Beam We…
×2
Push Flow
C/T
14.6 min
C/O
35 min
Availability
92%
Quality FPY
98.5%
Batch / EPEI
36 / 2d
OEE
85.9%
i
Insert a step here
+
I
67
2.79 d
SMED
Zero-Poin…
Drag to reorder step 3
PRECISION CELL
3. Vacuum Anneal & …
×2
BOTTLENECK
C/T
20.3 min
C/O
85 min
Availability
83%
Quality FPY
95.0%
Batch / EPEI
24 / 3d
OEE
64.0%
i
Insert a step here
+
I
53
2.21 d
Drag to reorder step 4
SPECIAL PROCESS
4. Helium Mass-Spec…
×1
Push Flow
C/T
15.4 min
C/O
30 min
Availability
93%
Quality FPY
98.2%
Batch / EPEI
36 / 2d
OEE
87.3%
i
Insert a step here
+
I
29
1.21 d
Drag to reorder step 5
AS9100 QUALITY
5. CT-Scan Throat P…
×2
FIFO Lane
C/T
13.1 min
C/O
15 min
Availability
95%
Quality FPY
97.6%
Batch / EPEI
12 / 1d
OEE
86.5%
i
Insert a step at the end
+
I
43
1.79 d
Finished Goods
OUT
2.21 d
VA 11.3 min
2.42 d
VA 14.6 min
2.79 d
VA 20.3 min
2.21 d
VA 15.4 min
1.21 d
VA 13.1 min
1.79 d
Total Lead Time
12.8 d
VA Time
1.2 h
PCE
1.30%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step