Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
LOX / Methane Rocket Engine Turbopump
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.3 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
12.0 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
5.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
5.62%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Silicon Nitride Bearing Fit
4 < 6/day
Limit: changeovers
Silicon Nitride Bearing Fit: capacity 4/day vs demand 6/day. Main limit: changeovers. Raw C/T 1.4 h, effective C/T 1.7 h.
Quality (RTY)
85.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,856,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
52.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
3D-Printed Nickel-All…
LPBF Impellers & Hybrid…
Weekly · LT 21d
PRODUCTION CONTROL / ERP
Space PLM
Engine Serial Synchronization
CUSTOMER
Launch Engine Test St…
6 units/d
Takt: 1.3 h
EDI / Weekly Stand
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
15
2.50 d
Drag to reorder step 1
FOUNDRY
1. LPBF Powder Sint…
×2
Push Flow
C/T
54.0 min
C/O
40 min
Availability
92%
Quality FPY
96.4%
Batch / EPEI
12 / 3d
OEE
84.7%
i
Insert a step here
+
I
13
2.17 d
Drag to reorder step 2
GRIND CELL
2. 5-Axis Inducer B…
×2
Push Flow
C/T
1.1 h
C/O
50 min
Availability
89%
Quality FPY
97.1%
Batch / EPEI
6 / 2d
OEE
76.8%
i
Insert a step here
+
I
16
2.67 d
AUTOMATION
Multi-Axi…
Drag to reorder step 3
THERMAL EDM
3. Silicon Nitride …
×2
BOTTLENECK
C/T
1.4 h
C/O
65 min
Availability
83%
Quality FPY
94.2%
Batch / EPEI
6 / 3d
OEE
66.9%
i
Insert a step here
+
I
8
1.33 d
Drag to reorder step 4
MODULE STACK
4. Rotor 38,000 RPM…
×2
FIFO Lane
C/T
57.0 min
C/O
30 min
Availability
92%
Quality FPY
98.0%
Batch / EPEI
3 / 1d
OEE
78.1%
i
FIFO
Insert a step here
+
I
7
1.17 d
Drag to reorder step 5
TEST CELL
5. LN2 Spin & Cavit…
×3
FIFO Lane
C/T
48.8 min
C/O
45 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
3 / 1d
OEE
74.3%
i
Insert a step at the end
+
I
9
1.50 d
Finished Goods
OUT
2.50 d
VA 54.0 min
2.17 d
VA 1.1 h
2.67 d
VA 1.4 h
1.33 d
VA 57.0 min
1.17 d
VA 48.8 min
1.50 d
Total Lead Time
12.0 d
VA Time
5.1 h
PCE
5.62%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step