Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Carbon Monocoque MALE UAV Airframe
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
32.1 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.3 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.1 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
2.77%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Structural Adhesive Join
9 < 14/day
Limit: downtime
Structural Adhesive Join: capacity 9/day vs demand 14/day. Main limit: downtime. Raw C/T 34.7 min, effective C/T 43.6 min.
Quality (RTY)
86.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€728,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
50.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Carbon prepreg suppli…
Carbon Prepreg & PVC Fo…
Weekly -18°C · LT 12d
PRODUCTION CONTROL / ERP
Business ERP
Autoclave Batch Load
CUSTOMER
Defense UAV Final Han…
14 units/d
Takt: 32.1 min
EDI / 2x / week
MRP / Weekly -18°C
★ PACEMAKER
IN
Insert a step at the start
+
I
22
1.57 d
Drag to reorder step 1
CLEANROOM PLY
1. CNC Cut Ply Book…
×2
FIFO Lane
C/T
20.9 min
C/O
20 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
14 / 2d
OEE
89.9%
i
FIFO
Insert a step here
+
I
28
2.00 d
Drag to reorder step 2
LAYUP ROOM
2. Out-of-Autoclave…
×2
Push Flow
C/T
27.0 min
C/O
45 min
Availability
90%
Quality FPY
97.2%
Batch / EPEI
11 / 2d
OEE
76.3%
i
Insert a step here
+
I
36
2.57 d
SMED
Quick Vac…
Drag to reorder step 3
CURE DECK
3. Structural Adhes…
×2
BOTTLENECK
C/T
34.7 min
C/O
60 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
21 / 3d
OEE
72.6%
i
Insert a step here
+
I
18
1.29 d
Drag to reorder step 4
TRIM BAY
4. Payload Hardpoin…
×2
FIFO Lane
C/T
23.8 min
C/O
25 min
Availability
93%
Quality FPY
97.8%
Batch / EPEI
7 / 1d
OEE
80.8%
i
FIFO
Insert a step here
+
I
15
1.07 d
Drag to reorder step 5
NDT LAB
5. 3G Proof Load & …
×2
FIFO Lane
C/T
21.9 min
C/O
15 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
7 / 1d
OEE
85.8%
i
Insert a step at the end
+
I
21
1.50 d
Finished Goods
OUT
1.57 d
VA 20.9 min
2.00 d
VA 27.0 min
2.57 d
VA 34.7 min
1.29 d
VA 23.8 min
1.07 d
VA 21.9 min
1.50 d
Total Lead Time
10.3 d
VA Time
2.1 h
PCE
2.77%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step