Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Encrypted Beyond-Line-of-Sight UAV Modem
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
7.5 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
9.07 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
29.7 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.73%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
AES Crypto Key Provision
40 < 60/day
Limit: downtime
AES Crypto Key Provision: capacity 40/day vs demand 60/day. Main limit: downtime. Raw C/T 8.1 min, effective C/T 10.2 min.
Quality (RTY)
87.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€2,052,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
52.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
High-end FPGA supplier
SDR Transceivers & Heat…
Weekly · LT 18d
PRODUCTION CONTROL / ERP
Business ERP
Serial Lot Qualification Push
CUSTOMER
Tactical Drone OEMs
60 units/d
Takt: 7.5 min
EDI / 2x / week
MRP / Weekly
★ PACEMAKER
IN
Insert a step at the start
+
I
90
1.50 d
Drag to reorder step 1
AVIONICS SMT
1. 14-Layer Blind V…
×2
Push Flow
C/T
5.4 min
C/O
35 min
Availability
94%
Quality FPY
98.2%
Batch / EPEI
48 / 2d
OEE
83.3%
i
Insert a step here
+
I
96
1.60 d
Drag to reorder step 2
CLASS-3 BENCH
2. CNC Milled RF Sh…
×4
Push Flow
C/T
6.2 min
C/O
15 min
Availability
92%
Quality FPY
96.8%
Batch / EPEI
30 / 1d
OEE
83.1%
i
Insert a step here
+
I
144
2.40 d
SMED
Parallel …
Drag to reorder step 3
ENV CHAMBER
3. AES Crypto Key P…
×2
BOTTLENECK
C/T
8.1 min
C/O
45 min
Availability
85%
Quality FPY
93.8%
Batch / EPEI
60 / 2d
OEE
71.8%
i
Insert a step here
+
I
66
1.10 d
Drag to reorder step 4
ENCLOSURE
4. Thermal Cycling …
×2
FIFO Lane
C/T
5.3 min
C/O
20 min
Availability
95%
Quality FPY
98.5%
Batch / EPEI
24 / 1d
OEE
83.2%
i
FIFO
Insert a step here
+
I
54
0.90 d
Drag to reorder step 5
FLIGHT CERT
5. Over-The-Air Lin…
×2
Continuous Flow
C/T
4.8 min
C/O
12 min
Availability
96%
Quality FPY
99.1%
Batch / EPEI
15 / 1d
OEE
85.0%
i
Insert a step at the end
+
I
90
1.50 d
Finished Goods
OUT
1.50 d
VA 5.4 min
1.60 d
VA 6.2 min
2.40 d
VA 8.1 min
1.10 d
VA 5.3 min
0.90 d
VA 4.8 min
1.50 d
Total Lead Time
9.07 d
VA Time
29.7 min
PCE
0.73%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step