Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Composite Upper/Lower Wing Skin Panel
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
2.8 h
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.6 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
11.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
4.69%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Double Vacuum Debulk Bag
6 < 8/day
Limit: downtime
Double Vacuum Debulk Bag: capacity 6/day vs demand 8/day. Main limit: downtime. Raw C/T 3.0 h, effective C/T 3.8 h.
Quality (RTY)
86.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,498,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
28.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Carbon tow supplier
Unidirectional Prepreg …
Weekly -18°C · LT 12d
PRODUCTION CONTROL / ERP
Aerospace ERP
Autoclave Batch Load
CUSTOMER
Wing Box Final Assemb…
8 parts/d
Takt: 2.8 h
EDI / 2x / week
MRP / Weekly -18°C
★ PACEMAKER
IN
Insert a step at the start
+
I
13
1.63 d
Drag to reorder step 1
CLEANROOM PLY
1. CNC Ultrasonic P…
×2
FIFO Lane
C/T
1.8 h
C/O
20 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
8 / 2d
OEE
92.7%
i
FIFO
Insert a step here
+
I
16
2.00 d
Drag to reorder step 2
LAYUP ROOM
2. Dual-Head ATL Ga…
×2
Push Flow
C/T
2.4 h
C/O
45 min
Availability
90%
Quality FPY
97.2%
Batch / EPEI
6 / 2d
OEE
83.6%
i
Insert a step here
+
I
21
2.63 d
SMED
Quick Vac…
Drag to reorder step 3
CURE DECK
3. Double Vacuum De…
×2
BOTTLENECK
C/T
3.0 h
C/O
60 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
12 / 3d
OEE
77.3%
i
Insert a step here
+
I
10
1.25 d
Drag to reorder step 4
TRIM BAY
4. 6-Bar Autoclave …
×2
FIFO Lane
C/T
2.1 h
C/O
25 min
Availability
93%
Quality FPY
97.8%
Batch / EPEI
4 / 1d
OEE
87.6%
i
FIFO
Insert a step here
+
I
9
1.13 d
Drag to reorder step 5
NDT LAB
5. Waterjet & TTU W…
×2
FIFO Lane
C/T
1.9 h
C/O
15 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
4 / 1d
OEE
89.9%
i
Insert a step at the end
+
I
12
1.50 d
Finished Goods
OUT
1.63 d
VA 1.8 h
2.00 d
VA 2.4 h
2.63 d
VA 3.0 h
1.25 d
VA 2.1 h
1.13 d
VA 1.9 h
1.50 d
Total Lead Time
10.6 d
VA Time
11.2 h
PCE
4.69%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step