Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Blended Aerodynamic Split-Scimitar Winglet
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
30.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.2 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
2.0 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.30%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Edge Trim & Lightning Mesh
21 < 30/day
Limit: downtime
Edge Trim & Lightning Mesh: capacity 21/day vs demand 30/day. Main limit: downtime. Raw C/T 32.4 min, effective C/T 40.7 min.
Quality (RTY)
86.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,484,700
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
107.7 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
High-modulus prepreg …
Carbon Prepreg & Al Rib
Weekly -18°C · LT 12d
PRODUCTION CONTROL / ERP
Production ERP
Autoclave Batch Load
CUSTOMER
Wing Final Install
30 parts/d
Takt: 30.0 min
EDI / 2x / week
MRP / Weekly -18°C
★ PACEMAKER
IN
Insert a step at the start
+
I
48
1.60 d
Drag to reorder step 1
CLEANROOM PLY
1. CNC Cut Kit & De…
×2
FIFO Lane
C/T
19.5 min
C/O
20 min
Availability
95%
Quality FPY
99.0%
Batch / EPEI
30 / 2d
OEE
92.0%
i
FIFO
Insert a step here
+
I
60
2.00 d
Drag to reorder step 2
LAYUP ROOM
2. Resin Film Infus…
×2
Push Flow
C/T
25.2 min
C/O
45 min
Availability
90%
Quality FPY
97.2%
Batch / EPEI
24 / 2d
OEE
82.0%
i
Insert a step here
+
I
78
2.60 d
SMED
Quick Vac…
Drag to reorder step 3
CURE DECK
3. Edge Trim & Ligh…
×2
BOTTLENECK
C/T
32.4 min
C/O
60 min
Availability
84%
Quality FPY
94.8%
Batch / EPEI
45 / 3d
OEE
76.1%
i
Insert a step here
+
I
39
1.30 d
Drag to reorder step 4
TRIM BAY
4. Static-Drain Wic…
×2
FIFO Lane
C/T
22.2 min
C/O
25 min
Availability
93%
Quality FPY
97.8%
Batch / EPEI
15 / 1d
OEE
85.9%
i
FIFO
Insert a step here
+
I
33
1.10 d
Drag to reorder step 5
NDT LAB
5. 3D Contour Wind-…
×2
FIFO Lane
C/T
20.4 min
C/O
15 min
Availability
95%
Quality FPY
96.8%
Batch / EPEI
15 / 1d
OEE
88.9%
i
Insert a step at the end
+
I
45
1.50 d
Finished Goods
OUT
1.60 d
VA 19.5 min
2.00 d
VA 25.2 min
2.60 d
VA 32.4 min
1.30 d
VA 22.2 min
1.10 d
VA 20.4 min
1.50 d
Total Lead Time
10.2 d
VA Time
2.0 h
PCE
1.30%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step