Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Laser & X-Ray Almond Hulling, Shelling & Pack
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
21.4 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
4.97 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.4 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.85%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Laser Color & Chip Optical
29 < 42/day
Limit: downtime
Laser Color & Chip Optical: capacity 29/day vs demand 42/day. Main limit: downtime. Raw C/T 22.9 min, effective C/T 29.4 min.
Quality (RTY)
87.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€861,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
4.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Orchard Sweeper Trail…
Field-Dried In-Hull Alm…
2x / day Orchards · LT 1d
PRODUCTION CONTROL / ERP
NutERP
Grower Lot Purge Campaign
CUSTOMER
Confectionery & Milk …
42 tonnes/d
Takt: 21.4 min
EDI / Daily Cold Container
MRP / 2x / day Orchards
★ PACEMAKER
IN
Insert a step at the start
+
I
34
0.81 d
Drag to reorder step 1
WET INTAKE
1. De-Twig & Shear-…
×3
Push Flow
C/T
13.7 min
C/O
15 min
Availability
94%
Quality FPY
97.8%
Batch / EPEI
21 / 1d
OEE
88.9%
i
Insert a step here
+
I
29
0.69 d
Drag to reorder step 2
WASH TUNNEL
2. Gravity Air-Leg …
×2
Continuous Flow
C/T
16.7 min
C/O
12 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
17 / 1d
OEE
88.5%
i
Insert a step here
+
I
50
1.19 d
SMED
RFID Cont…
Drag to reorder step 3
GRADING LINE
3. Laser Color & Ch…
×6
BOTTLENECK
C/T
22.9 min
C/O
28 min
Availability
84%
Quality FPY
93.0%
Batch / EPEI
25 / 1d
OEE
74.0%
i
Insert a step here
+
I
38
0.90 d
Drag to reorder step 4
COLD TUNNEL
4. Pasteurization S…
×4
FIFO Lane
C/T
17.6 min
C/O
10 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
13 / 1d
OEE
88.2%
i
FIFO
Insert a step here
+
I
25
0.60 d
Drag to reorder step 5
EXPORT DOCK
5. Vacuum 50lb Cart…
×2
Continuous Flow
C/T
12.0 min
C/O
8 min
Availability
97%
Quality FPY
99.2%
Batch / EPEI
13 / 1d
OEE
93.5%
i
Insert a step at the end
+
I
29
0.69 d
Finished Goods
OUT
0.81 d
VA 13.7 min
0.69 d
VA 16.7 min
1.19 d
VA 22.9 min
0.90 d
VA 17.6 min
0.60 d
VA 12.0 min
0.69 d
Total Lead Time
4.97 d
VA Time
1.4 h
PCE
1.85%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step