Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
23 s
Lead Time (LT)
4.90 d
Value-Added
87 s
Efficiency (PCE)
0.03%
BottleneckNIR Dry-Matter Density Sort
1,660 < 2,400/day
Limit: downtime
Quality (RTY)
87.4%
WIP Capital
€135,240
Carbon CO₂
280.1 t CO₂e/year