Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Soft-Touch Air-Cushion Blueberry Clamshell Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.7 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
4.90 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
22 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Optical Soft-Berry/Color Kick
6,557 < 9,500/day
Limit: downtime
Optical Soft-Berry/Color Kick: capacity 6,557/day vs demand 9,500/day. Main limit: downtime. Raw C/T 6.1 s, effective C/T 7.8 s.
Quality (RTY)
87.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€67,498
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,108.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Early Morning Hand-Pi…
Chilled Unsorted Field …
2x / day Orchards · LT 1d
PRODUCTION CONTROL / ERP
BerryERP
Grower Lot Purge Campaign
CUSTOMER
Air & Retail Supermar…
9,500 packs/d
Takt: 5.7 s
EDI / Daily Cold Container
MRP / 2x / day Orchards
★ PACEMAKER
IN
Insert a step at the start
+
I
7,600
0.80 d
Drag to reorder step 1
WET INTAKE
1. 2°C Rapid Pre-Co…
×3
Push Flow
C/T
3.6 s
C/O
15 min
Availability
94%
Quality FPY
97.8%
Batch / EPEI
4750 / 1d
OEE
88.9%
i
Insert a step here
+
I
6,650
0.70 d
Drag to reorder step 2
WASH TUNNEL
2. Gentle Soft-Drop…
×2
Continuous Flow
C/T
4.4 s
C/O
12 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
3800 / 1d
OEE
88.5%
i
Insert a step here
+
I
11,400
1.20 d
SMED
RFID Cont…
Drag to reorder step 3
GRADING LINE
3. Optical Soft-Ber…
×6
BOTTLENECK
C/T
6.1 s
C/O
28 min
Availability
84%
Quality FPY
93.0%
Batch / EPEI
5700 / 1d
OEE
74.1%
i
Insert a step here
+
I
8,550
0.90 d
Drag to reorder step 4
COLD TUNNEL
4. 12-Head Rotary C…
×4
FIFO Lane
C/T
4.7 s
C/O
10 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
2850 / 1d
OEE
88.1%
i
FIFO
Insert a step here
+
I
5,700
0.60 d
Drag to reorder step 5
EXPORT DOCK
5. Label, Checkweig…
×2
Continuous Flow
C/T
3.2 s
C/O
8 min
Availability
97%
Quality FPY
99.2%
Batch / EPEI
2850 / 1d
OEE
93.4%
i
Insert a step at the end
+
I
6,650
0.70 d
Finished Goods
OUT
0.80 d
VA 3.6 s
0.70 d
VA 4.4 s
1.20 d
VA 6.1 s
0.90 d
VA 4.7 s
0.60 d
VA 3.2 s
0.70 d
Total Lead Time
4.90 d
VA Time
22 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step