Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
4.8 min
Lead Time (LT)
4.51 d
Value-Added
18.4 min
Efficiency (PCE)
0.30%
Bottleneck85°C Salmonellosis Condition
197 < 280/day
Limit: downtime
Quality (RTY)
87.9%
WIP Capital
€302,400
Carbon CO₂
95.0 t CO₂e/year