Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Living & Cut Fresh Herb Sleeve & Clamshell Line
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
3.2 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
4.90 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
12 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Perforated Conical Flow Sleeve
5,560 < 8,500/day
Limit: downtime
Perforated Conical Flow Sleeve: capacity 5,560/day vs demand 8,500/day. Main limit: downtime. Raw C/T 3.4 s, effective C/T 4.4 s.
Quality (RTY)
87.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€35,403
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
991.8 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Hydroponic Glasshouses
Same-Hour Cut Herb Bunc…
2x / day Orchards · LT 1d
PRODUCTION CONTROL / ERP
HerbERP
Grower Lot Purge Campaign
CUSTOMER
Grocery Refrigerated …
8,500 packs/d
Takt: 3.2 s
EDI / Daily Cold Container
MRP / 2x / day Orchards
★ PACEMAKER
IN
Insert a step at the start
+
I
6,800
0.80 d
Drag to reorder step 1
WET INTAKE
1. Cool Misty Ambie…
×3
Push Flow
C/T
2.0 s
C/O
15 min
Availability
94%
Quality FPY
97.8%
Batch / EPEI
4250 / 1d
OEE
85.8%
i
Insert a step here
+
I
5,950
0.70 d
Drag to reorder step 2
WASH TUNNEL
2. Semi-Auto Bundle…
×2
Continuous Flow
C/T
2.5 s
C/O
12 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
3400 / 1d
OEE
85.4%
i
Insert a step here
+
I
10,200
1.20 d
SMED
RFID Cont…
Drag to reorder step 3
GRADING LINE
3. Perforated Conic…
×6
BOTTLENECK
C/T
3.4 s
C/O
28 min
Availability
84%
Quality FPY
93.0%
Batch / EPEI
5100 / 1d
OEE
70.0%
i
Insert a step here
+
I
7,650
0.90 d
Drag to reorder step 4
COLD TUNNEL
4. Trace Sticker & …
×4
FIFO Lane
C/T
2.6 s
C/O
10 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
2550 / 1d
OEE
84.7%
i
FIFO
Insert a step here
+
I
5,100
0.60 d
Drag to reorder step 5
EXPORT DOCK
5. 10°C Ethylene-Fr…
×2
Continuous Flow
C/T
1.8 s
C/O
8 min
Availability
97%
Quality FPY
99.2%
Batch / EPEI
2550 / 1d
OEE
90.5%
i
Insert a step at the end
+
I
5,950
0.70 d
Finished Goods
OUT
0.80 d
VA 2.0 s
0.70 d
VA 2.5 s
1.20 d
VA 3.4 s
0.90 d
VA 2.6 s
0.60 d
VA 1.8 s
0.70 d
Total Lead Time
4.90 d
VA Time
12 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step