Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Tidal Bed Oyster Tumbler Grading & Purification
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
56 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
4.51 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.6 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.18%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Optical Weight & Size Drop
295 < 480/day
Limit: changeovers
Optical Weight & Size Drop: capacity 295/day vs demand 480/day. Main limit: changeovers. Raw C/T 60 s, effective C/T 75 s.
Quality (RTY)
87.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€51,840
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
162.9 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Intertidal Bag Farms
Harvested Wild/Farmed O…
Daily Feed/Seed · LT 2d
PRODUCTION CONTROL / ERP
ShellfishERP
Harvest Window Bottleneck
CUSTOMER
Restaurants & Seafood…
480 crates/d
Takt: 56 s
EDI / Daily Chilled/Tank
MRP / Daily Feed/Seed
★ PACEMAKER
IN
Insert a step at the start
+
I
432
0.90 d
Drag to reorder step 1
BIO INTAKE
1. High-Pressure Mu…
×2
Push Flow
C/T
37 s
C/O
12 min
Availability
95%
Quality FPY
97.8%
Batch / EPEI
240 / 1d
OEE
88.0%
i
Insert a step here
+
I
576
1.20 d
Drag to reorder step 2
GROW ZONE
2. 48h UV-Flow Depu…
×2
Push Flow
C/T
46 s
C/O
15 min
Availability
93%
Quality FPY
96.8%
Batch / EPEI
240 / 1d
OEE
84.0%
i
Insert a step here
+
I
480
1.00 d
FLOW
Automated…
Drag to reorder step 3
HARVEST HUB
3. Optical Weight &…
×4
BOTTLENECK
C/T
60 s
C/O
25 min
Availability
85%
Quality FPY
94.5%
Batch / EPEI
144 / 1d
OEE
65.4%
i
Insert a step here
+
I
240
0.50 d
Drag to reorder step 4
BIO LAB
4. Wet Seaweed & Wo…
×2
FIFO Lane
C/T
41 s
C/O
6 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
96 / 1d
OEE
88.5%
i
FIFO
Insert a step here
+
I
192
0.40 d
Drag to reorder step 5
FARM DOCK
5. Ice-Gel 4°C Nigh…
×2
Continuous Flow
C/T
30 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
96 / 1d
OEE
87.8%
i
Insert a step at the end
+
I
240
0.50 d
Finished Goods
OUT
0.90 d
VA 37 s
1.20 d
VA 46 s
1.00 d
VA 60 s
0.50 d
VA 41 s
0.40 d
VA 30 s
0.50 d
Total Lead Time
4.51 d
VA Time
3.6 min
PCE
0.18%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step