Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Fresh Produce Optical Grading & Export Pack
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
30 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
4.90 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
116 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.04%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Optical Sizer & Brix Grading
1,246 < 1,800/day
Limit: downtime
Optical Sizer & Brix Grading: capacity 1,246/day vs demand 1,800/day. Main limit: downtime. Raw C/T 32 s, effective C/T 41 s.
Quality (RTY)
87.4%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€83,790
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
210.0 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Orchard Grower Cooper…
Harvest Field Bins
2x / day Orchards · LT 1d
PRODUCTION CONTROL / ERP
Packhouse ERP + Phyto Certs
Grower Lot Purge Campaign
CUSTOMER
EU & UK Supermarket C…
1,800 crates/d
Takt: 30 s
EDI / Daily Cold Container
MRP / 2x / day Orchards
★ PACEMAKER
IN
Insert a step at the start
+
I
1,440
0.80 d
Drag to reorder step 1
WET INTAKE
1. Bin Reception & …
×3
Push Flow
C/T
19 s
C/O
15 min
Availability
94%
Quality FPY
97.8%
Batch / EPEI
900 / 1d
OEE
88.9%
i
Insert a step here
+
I
1,260
0.70 d
Drag to reorder step 2
WASH TUNNEL
2. Wash, Wax & Dry …
×2
Continuous Flow
C/T
23 s
C/O
12 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
720 / 1d
OEE
88.5%
i
Insert a step here
+
I
2,160
1.20 d
SMED
RFID Cont…
Drag to reorder step 3
GRADING LINE
3. Optical Sizer & …
×6
BOTTLENECK
C/T
32 s
C/O
28 min
Availability
84%
Quality FPY
93.0%
Batch / EPEI
1080 / 1d
OEE
74.1%
i
Insert a step here
+
I
1,620
0.90 d
Drag to reorder step 4
COLD TUNNEL
4. Carton Fill & Co…
×4
FIFO Lane
C/T
25 s
C/O
10 min
Availability
93%
Quality FPY
98.4%
Batch / EPEI
540 / 1d
OEE
88.1%
i
FIFO
Insert a step here
+
I
1,080
0.60 d
Drag to reorder step 5
EXPORT DOCK
5. Phyto QC & Conta…
×2
Continuous Flow
C/T
17 s
C/O
8 min
Availability
97%
Quality FPY
99.2%
Batch / EPEI
540 / 1d
OEE
93.4%
i
Insert a step at the end
+
I
1,260
0.70 d
Finished Goods
OUT
0.80 d
VA 19 s
0.70 d
VA 23 s
1.20 d
VA 32 s
0.90 d
VA 25 s
0.60 d
VA 17 s
0.70 d
Total Lead Time
4.90 d
VA Time
116 s
PCE
0.04%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step