Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Humane Night Modular-Drawer Broiler Harvest Loop
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
5.0 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
4.52 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
19.1 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.47%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Ventilated Curtain Truck Haul
123 < 180/day
Limit: downtime
Ventilated Curtain Truck Haul: capacity 123/day vs demand 180/day. Main limit: downtime. Raw C/T 5.4 min, effective C/T 6.7 min.
Quality (RTY)
87.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€133,650
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
61.1 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
42-Day Grow-Out Farms
Market-Weight Chickens
Daily Feed/Seed · LT 2d
PRODUCTION CONTROL / ERP
PoultryLog ERP
Harvest Window Bottleneck
CUSTOMER
Primary Processing Pl…
180 crates/d
Takt: 5.0 min
EDI / Daily Chilled/Tank
MRP / Daily Feed/Seed
★ PACEMAKER
IN
Insert a step at the start
+
I
162
0.90 d
Drag to reorder step 1
BIO INTAKE
1. Pre-Catch Feed W…
×2
Push Flow
C/T
3.3 min
C/O
12 min
Availability
95%
Quality FPY
97.8%
Batch / EPEI
90 / 1d
OEE
90.4%
i
Insert a step here
+
I
216
1.20 d
Drag to reorder step 2
GROW ZONE
2. Dim-Light Module…
×2
Push Flow
C/T
4.1 min
C/O
15 min
Availability
93%
Quality FPY
96.8%
Batch / EPEI
90 / 1d
OEE
87.0%
i
Insert a step here
+
I
180
1.00 d
FLOW
Automated…
Drag to reorder step 3
HARVEST HUB
3. Ventilated Curta…
×4
BOTTLENECK
C/T
5.4 min
C/O
25 min
Availability
85%
Quality FPY
94.5%
Batch / EPEI
54 / 1d
OEE
72.9%
i
Insert a step here
+
I
90
0.50 d
Drag to reorder step 4
BIO LAB
4. Lairage Mist Fan…
×2
FIFO Lane
C/T
3.6 min
C/O
6 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
36 / 1d
OEE
91.7%
i
FIFO
Insert a step here
+
I
72
0.40 d
Drag to reorder step 5
FARM DOCK
5. Controlled-Atmos…
×2
Continuous Flow
C/T
2.7 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
36 / 1d
OEE
92.1%
i
Insert a step at the end
+
I
90
0.50 d
Finished Goods
OUT
0.90 d
VA 3.3 min
1.20 d
VA 4.1 min
1.00 d
VA 5.4 min
0.50 d
VA 3.6 min
0.40 d
VA 2.7 min
0.50 d
Total Lead Time
4.52 d
VA Time
19.1 min
PCE
0.47%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step