Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Automated Rotary & Robotic Milking Parlor
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
18.8 min
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
4.58 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
1.2 h
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
1.73%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Inline SCC & Mastitis Divert
33 < 48/day
Limit: downtime
Inline SCC & Mastitis Divert: capacity 33/day vs demand 48/day. Main limit: downtime. Raw C/T 20.1 min, effective C/T 25.0 min.
Quality (RTY)
87.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€90,720
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
16.3 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Pasture & TMR Ration …
600-Cow Lactating Herd
Daily Feed/Seed · LT 2d
PRODUCTION CONTROL / ERP
Dairy Herd MIS
Harvest Window Bottleneck
CUSTOMER
UHT & Cheese Tanker C…
48 batches/d
Takt: 18.8 min
EDI / Daily Chilled/Tank
MRP / Daily Feed/Seed
★ PACEMAKER
IN
Insert a step at the start
+
I
43
0.90 d
Drag to reorder step 1
BIO INTAKE
1. RFID Cow Gate & …
×2
Push Flow
C/T
12.4 min
C/O
12 min
Availability
95%
Quality FPY
97.8%
Batch / EPEI
24 / 1d
OEE
90.4%
i
Insert a step here
+
I
58
1.21 d
Drag to reorder step 2
GROW ZONE
2. Laser-Guided Cup…
×2
Push Flow
C/T
15.4 min
C/O
15 min
Availability
93%
Quality FPY
96.8%
Batch / EPEI
24 / 1d
OEE
87.0%
i
Insert a step here
+
I
48
1.00 d
FLOW
Automated…
Drag to reorder step 3
HARVEST HUB
3. Inline SCC & Mas…
×4
BOTTLENECK
C/T
20.1 min
C/O
25 min
Availability
85%
Quality FPY
94.5%
Batch / EPEI
14 / 1d
OEE
72.7%
i
Insert a step here
+
I
24
0.50 d
Drag to reorder step 4
BIO LAB
4. Plate Cooler Ins…
×2
FIFO Lane
C/T
13.5 min
C/O
6 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
10 / 1d
OEE
91.8%
i
FIFO
Insert a step here
+
I
19
0.40 d
Drag to reorder step 5
FARM DOCK
5. Daily Insulated …
×2
Continuous Flow
C/T
10.1 min
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
10 / 1d
OEE
92.3%
i
Insert a step at the end
+
I
24
0.50 d
Finished Goods
OUT
0.90 d
VA 12.4 min
1.21 d
VA 15.4 min
1.00 d
VA 20.1 min
0.50 d
VA 13.5 min
0.40 d
VA 10.1 min
0.50 d
Total Lead Time
4.58 d
VA Time
1.2 h
PCE
1.73%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step