Free online VSM editor

Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.

Takt Time
3.9 s
Lead Time (LT)
4.90 d
Value-Added
15 s
Efficiency (PCE)
0.01%
BottleneckSpin Centrifuge Dry Tunnel
9,755 < 14,000/day
Limit: downtime
Quality (RTY)
87.4%
WIP Capital
€65,170
Carbon CO₂
1,633.6 t CO₂e/year