Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Automated Grafted Tomato & Pepper Plug Nursery
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
1.5 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
4.50 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
6.4 s
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.01%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
95%-RH Healing Chamber Callus
11,045 < 18,000/day
Limit: changeovers
95%-RH Healing Chamber Callus: capacity 11,045/day vs demand 18,000/day. Main limit: changeovers. Raw C/T 1.6 s, effective C/T 2.0 s.
Quality (RTY)
87.9%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€52,650
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
6,108.5 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Rootstock & Scion See…
Peat Plug Trays & Clips
Daily Feed/Seed · LT 2d
PRODUCTION CONTROL / ERP
NurseryERP
Harvest Window Bottleneck
CUSTOMER
Commercial Greenhouses
18,000 units/d
Takt: 1.5 s
EDI / Daily Chilled/Tank
MRP / Daily Feed/Seed
★ PACEMAKER
IN
Insert a step at the start
+
I
16,200
0.90 d
Drag to reorder step 1
BIO INTAKE
1. Drum Seeder & Mi…
×2
Push Flow
C/T
1.2 s
C/O
12 min
Availability
95%
Quality FPY
97.8%
Batch / EPEI
9000 / 1d
OEE
88.0%
i
Insert a step here
+
I
21,600
1.20 d
Drag to reorder step 2
GROW ZONE
2. Robot Grafting C…
×2
Push Flow
C/T
1.2 s
C/O
15 min
Availability
93%
Quality FPY
96.8%
Batch / EPEI
9000 / 1d
OEE
84.0%
i
Insert a step here
+
I
18,000
1.00 d
FLOW
Automated…
Drag to reorder step 3
HARVEST HUB
3. 95%-RH Healing C…
×4
BOTTLENECK
C/T
1.6 s
C/O
25 min
Availability
85%
Quality FPY
94.5%
Batch / EPEI
5400 / 1d
OEE
65.4%
i
Insert a step here
+
I
9,000
0.50 d
Drag to reorder step 4
BIO LAB
4. Boom Irrigation …
×2
FIFO Lane
C/T
1.2 s
C/O
6 min
Availability
96%
Quality FPY
98.8%
Batch / EPEI
3600 / 1d
OEE
88.5%
i
FIFO
Insert a step here
+
I
7,200
0.40 d
Drag to reorder step 5
FARM DOCK
5. Roll-Rack Climat…
×2
Continuous Flow
C/T
1.2 s
C/O
8 min
Availability
97%
Quality FPY
99.4%
Batch / EPEI
3600 / 1d
OEE
87.8%
i
Insert a step at the end
+
I
9,000
0.50 d
Finished Goods
OUT
0.90 d
VA 1.2 s
1.20 d
VA 1.2 s
1.00 d
VA 1.6 s
0.50 d
VA 1.2 s
0.40 d
VA 1.2 s
0.50 d
Total Lead Time
4.50 d
VA Time
6.4 s
PCE
0.01%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step