Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
Heavy Truck EBS Electronic Brake Valve
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
60 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
11.0 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
4.0 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.04%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Diaphragm & Coil Insertion
615 < 900/day
Limit: downtime
Diaphragm & Coil Insertion: capacity 615/day vs demand 900/day. Main limit: downtime. Raw C/T 64 s, effective C/T 80 s.
Quality (RTY)
87.2%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,435,500
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
1,544.4 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Die-cast aluminum sup…
Cast Bodies & Proportio…
2x / week · LT 8d
PRODUCTION CONTROL / ERP
Automotive ERP
Order Slot Batch Release
CUSTOMER
Trailer & Truck Chass…
900 units/d
Takt: 60 s
EDI / Daily Convoy
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
1,800
2.00 d
Drag to reorder step 1
HEAVY BAY 1
1. Multi-Axis Press…
×3
Push Flow
C/T
42 s
C/O
35 min
Availability
94%
Quality FPY
98.8%
Batch / EPEI
900 / 2d
OEE
89.3%
i
Insert a step here
+
I
1,980
2.20 d
Drag to reorder step 2
WELD JIG
2. Ball Burnish & V…
×4
Push Flow
C/T
51 s
C/O
50 min
Availability
89%
Quality FPY
96.5%
Batch / EPEI
900 / 2d
OEE
81.1%
i
Insert a step here
+
I
2,160
2.40 d
BALANCING
Moving Pu…
Drag to reorder step 3
PULSE LINE
3. Diaphragm & Coil…
×6
BOTTLENECK
C/T
64 s
C/O
40 min
Availability
84%
Quality FPY
95.2%
Batch / EPEI
450 / 1d
OEE
72.9%
i
Insert a step here
+
I
1,350
1.50 d
Drag to reorder step 4
PAINT BAY
4. Software ECU Par…
×3
Push Flow
C/T
48 s
C/O
30 min
Availability
91%
Quality FPY
97.1%
Batch / EPEI
900 / 2d
OEE
85.4%
i
Insert a step here
+
I
810
0.90 d
Drag to reorder step 5
PDI TRACK
5. Pressure Step De…
×2
FIFO Lane
C/T
35 s
C/O
10 min
Availability
96%
Quality FPY
98.9%
Batch / EPEI
225 / 1d
OEE
90.7%
i
Insert a step at the end
+
I
1,800
2.00 d
Finished Goods
OUT
2.00 d
VA 42 s
2.20 d
VA 51 s
2.40 d
VA 64 s
1.50 d
VA 48 s
0.90 d
VA 35 s
2.00 d
Total Lead Time
11.0 d
VA Time
4.0 min
PCE
0.04%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step