Home
/
Editor
Free online VSM editor
Pick a template or start a blank map, then edit cycle times and watch the bottleneck move.
VSME
.net
/
BIW Aluminum Door Shell & Hemming
Current State
Create Future State
Blueprints
Smart Advisor
Export
EN
VSM Map
Yamazumi & Pareto
Simulation & Pull
OpEx Suite
Before / After ROI
Data & Excel
Current State
Optimize Flow
Takt Time
49 s
Takt time = available time per day ÷ customer demand per day: the pace at which the customer buys.
Lead Time (LT)
10.0 d
Lead time = total time a unit spends in the flow: waiting in stock (stock ÷ daily demand) plus processing.
Value-Added
3.4 min
Value-added time = sum of the cycle times of all steps: the time actually spent transforming the product.
Efficiency (PCE)
0.04%
Process cycle efficiency = value-added time ÷ lead time. Both are counted in available production time (shift time less breaks), not in calendar time.
Bottleneck
Robotic Laser Brazing
783 < 1,100/day
Limit: downtime
Robotic Laser Brazing: capacity 783/day vs demand 1,100/day. Main limit: downtime. Raw C/T 53 s, effective C/T 64 s.
Quality (RTY)
89.0%
Rolled throughput yield = product of the first-pass yields of all steps: the share of units right first time.
WIP Capital
€1,430,000
Working capital tied up in stock: units in buffers and finished goods × unit cost.
Carbon CO₂
368.2 t CO₂e/year
Blank Value Stream (Free)
1,080 Industry Templates (Free)
Generate with AI
Sign In · 5 Free AI Credits
VSME.net · ISO 22468 Value Stream Map · Current State
SUPPLIER
Aluminum sheet coil m…
5xxx & 6xxx Al Blanks
2x / week · LT 6d
PRODUCTION CONTROL / ERP
Automotive ERP
Departmental Push MRP
CUSTOMER
Body-in-White Assembl…
1,100 parts/d
Takt: 49 s
EDI / 2x / day
MRP / 2x / week
★ PACEMAKER
IN
Insert a step at the start
+
I
2,640
2.40 d
SMED
SMED Hydr…
Drag to reorder step 1
PRESS SHOP
1. Coil Blanking & …
×2
Push Flow
C/T
33 s
C/O
75 min
Availability
88%
Quality FPY
98.5%
Batch / EPEI
2200 / 3d
OEE
83.1%
i
Insert a step here
+
I
1,980
1.80 d
Drag to reorder step 2
BODY CELL
2. 2500T Tandem Sta…
×1
Push Flow
C/T
41 s
C/O
35 min
Availability
90%
Quality FPY
97.4%
Batch / EPEI
880 / 2d
OEE
83.4%
i
Insert a step here
+
I
2,090
1.90 d
Drag to reorder step 3
E-COAT
3. Roller Hem & Str…
×2
Push Flow
C/T
44 s
C/O
40 min
Availability
91%
Quality FPY
97.9%
Batch / EPEI
1100 / 2d
OEE
85.1%
i
Insert a step here
+
I
1,760
1.60 d
BALANCING
Kanban Pu…
Drag to reorder step 4
FINAL LINE
4. Robotic Laser Br…
×4
BOTTLENECK
C/T
53 s
C/O
18 min
Availability
86%
Quality FPY
95.8%
Batch / EPEI
330 / 1d
OEE
76.9%
i
Insert a step here
+
I
880
0.80 d
Drag to reorder step 5
QUALITY GATE
5. Blue-Light Gap S…
×2
FIFO Lane
C/T
35 s
C/O
12 min
Availability
95%
Quality FPY
98.9%
Batch / EPEI
165 / 1d
OEE
85.6%
i
Insert a step at the end
+
FG
1,650
1.50 d
Finished Goods
OUT
2.40 d
VA 33 s
1.80 d
VA 41 s
1.90 d
VA 44 s
1.60 d
VA 53 s
0.80 d
VA 35 s
1.50 d
Total Lead Time
10.0 d
VA Time
3.4 min
PCE
0.04%
Drag the background (or hold Space) to pan · Ctrl+scroll to zoom · drag a step header to reorder · F for full screen
90%
100%
Fit
Full screen
Dark Blueprint
Info Flows
Kaizen
Green CO₂
Add step